Ramp alterations PH II

SOL #: W50S8SRPHII2026Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NU USPFO ACTIVITY OHANG 180
SWANTON, OH, 43558-9645, United States

Place of Performance

Swanton, OH

NAICS

Poured Concrete Foundation and Structure Contractors (238110)

PSC

Repair Or Alteration Of Airport Service Roads (Z2LA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 12, 2026
2
Last Updated
Mar 16, 2026
3
Response Deadline
Apr 13, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Ohio Air National Guard (OHANG) is conducting market research through a Sources Sought notice for Ramp Alterations Phase II at Swanton, OH. This effort seeks to identify potential vendors, including Small Businesses, capable of performing extensive demolition, site preparation, storm water management, electrical installations, and the construction of new concrete pavements and tensioned fabric shelters. This is a Total Small Business Set-Aside. Responses are requested by April 13, 2026.

Scope of Work

The project involves comprehensive site alterations, as detailed in the provided drawings:

  • Demolition: Removal of buildings (115, 131, 133, 321), abandoned electrical components, guardrail, fencing, and existing concrete/asphalt areas.
  • Storm Water Control: Installation of new storm water control structures, including catch basins, piping, and trench drains, to ensure proper drainage.
  • Electrical Infrastructure: Installation of required electrical conduit and wiring to support new fabric shelters.
  • Pavement Construction: Preparation and placement of a new concrete access road, concrete tent pad, concrete approach around building 137, and an asphalt shoulder patch.
  • Fabric Shelters: Purchase and installation of two new tensioned fabric shelters (60'x80'x28' with a minimum 20-year lifespan), complete with liners, electrical equipment, interior lights, and doors. One shelter will include dehumidification equipment.
  • Contractor Responsibilities: Provide all labor, equipment, tools, appliances, transportation, materials, disposal, and associated documentation.

Contract & Timeline

  • Type: Sources Sought (Market Research)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 238110 (Poured Concrete Foundation and Structure Contractors)
  • Response Due: April 13, 2026, by 4:00 PM EST (via email)
  • Site Visit: April 7, 2026, at 10:00 AM EST
  • Published: March 12, 2026

Additional Notes

This notice is for informational purposes only and does not constitute a solicitation (RFP, IFB, or RFQ). The Government is under no obligation to award a contract as a result of this announcement, and no funds will be paid for response preparation. Responses will inform future acquisition strategies, including potential small business participation. Interested parties must submit an Interested Vendor Form and a narrative statement (max three pages) to Adam Krouse at adam.krouse@us.af.mil.

People

Points of Contact

2d Lt Adam KrousePRIMARY
Barry B. BealeSECONDARY

Files

Files

Download

Versions

Version 2
Sources Sought
Posted: Mar 16, 2026
View
Version 1Viewing
Sources Sought
Posted: Mar 12, 2026
Ramp alterations PH II | GovScope