Ramp repair PH II
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USPFO for Ohio is issuing an Invitation for Bid (IFB) to award a single Firm Fixed-Price contract for Ramp Repair Phase II at the 180th Fighter Wing (FW), Swanton, Ohio Air National Guard Base. This project involves extensive demolition, new construction of storm water systems, pavements, electrical infrastructure, and the installation of two new fabric shelters to enhance operational efficiency and aircraft safety. This opportunity is a 100% Small Business Set-Aside.
Scope of Work
The project's objective is to provide all plant, labor, transportation, materials, tools, equipment, and supervision for comprehensive ramp alterations. Key tasks include:
- Demolition: Removal of buildings 115, 131, 133, tent structure 321, abandoned electrical components, guardrail, fencing, concrete/asphalt areas, and a 12K underground storage tank.
- Storm Water Control: Installation of new storm water control structures, including catch basins, piping, and trench drains, to manage water flow and maintain grounds.
- Electrical Infrastructure: Installation of required electrical conduit and wiring to support new fabric shelters, including associated equipment and interior lights.
- Pavement & Access: Preparation of areas for and installation of a new concrete access road, concrete tent pad, concrete approach around building 137, and asphalt shoulder patching.
- Fabric Shelters: Procurement and installation of two new tensioned fabric shelters (~80'x60') with liners, electrical equipment, interior lights, and doors. One shelter will include dehumidification equipment for humidity control.
- Site Restoration: Filling, leveling, grading, and seeding/straw of disturbed areas.
Contract & Timeline
- Contract Type: Firm Fixed-Price
- Duration: 180 calendar days after Notice to Proceed (NTP), including estimated lead time for equipment delivery.
- Set-Aside: 100% Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238110 (Construction of Utilities Infrastructure)
- Size Standard: $19,000,000.00
- Magnitude: Between $1,000,000 and $5,000,000
- Pre-bid Conference/Site Visit: July 1, 2026, at 10:00 AM EST at 2660 South Eber Rd, Swanton, OH 43558. Contractors must register and arrange base access.
- Questions Due for Pre-bid: 3 business days prior to July 1, 2026.
- Bid Opening Date: July 13, 2026, at 4:00 PM EST.
Submission & Evaluation
- Bonds: Performance and Payment Bonds are required.
- SAM Registration: Offerors must be registered in SAM.gov to submit a bid and access solicitation documents. Registration can take approximately 15 business days.
- Limitations on Subcontracting: FAR Clause 52.219-14 (e)(3) applies, limiting payments to non-similarly situated subcontractors to 85% of the contract amount (excluding materials).
- Submittals: Required submittals include cut sheets, concrete design, trench drains, fabric shelters, electrical panel, lighting transformer, 12K tank testing results, O&M manuals, and as-built drawings.
- Payments: Payment requests and receiving reports must be submitted electronically via Wide Area WorkFlow (WAWF).
Important Notes
Contractors are responsible for field verifying all underground utilities and dimensions. Compliance with installation access, security policies, and safety regulations (OSHA, FOD inspection) is mandatory. All official solicitation documents and amendments will be posted exclusively on SAM.gov.