Range 7 Full Gran-Tex Material Exchange/Panzer Kaserne Range Complex
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically 0409 AQ HQ CONTRACT, has issued a Combined Synopsis/Solicitation for Range 7 Full Gran-Tex Material Exchange/Panzer Kaserne Range Complex. This opportunity seeks non-personal services for range maintenance and lead/residue remediation at the Panzer Range Complex – Range 7 in Baumholder, Germany. The primary goal is to enhance operational safety and reduce ricochet probability through a full material exchange. Responses are due by March 27, 2026, at 4:00 PM Z.
Scope of Work
This contract requires a full material exchange for Range 7, incorporating granulated rubber (Gran Tex® or similar ballistic rubber) or rubber blocks at target emplacements. Key services include:
- Full Material Exchange: Removal of existing material and replacement with granulated rubber or rubber blocks.
- Lead/Residue Remediation: Comprehensive cleanup during and after material removal.
- Rubber Matting: Inspection, repair, replacement, and re-installation of rubber matting to cover bullet catches.
- Support: Provision of all necessary personnel, equipment, supplies, transportation, tools, materials, and supervision.
Contract & Timeline
- Type: Combined Synopsis/Solicitation
- Set-Aside: None specified
- Place of Performance: Range 7 at the Panzer Range Complex (PRC) in Boeblingen (Stuttgart), Germany.
- Operating Hours: Contractor support hours are 0730-1630 Monday through Friday, excluding U.S. Holidays.
- Response Due: March 27, 2026, 4:00 PM Z
- Published: March 17, 2026, 10:05 AM Z
Special Requirements
- Quality Control: Contractor must develop and maintain a Quality Control Plan (QCP) and meet specified standards and Acceptable Quality Levels (AQLs).
- Security: Compliance with installation access control regulations (AE Reg 190-16, AE Reg 604-1) and background checks is mandatory.
- Safety: Adherence to FAR 52.236-13, EM 385-1-1, and applicable Host Nation Safety Laws. An Accident Prevention Plan and Activity Hazard Analysis (AHA) are required.
- Environmental Compliance: Removal and disposal of heavy metals, lead, ammunition residue, and unserviceable rubber material must comply with European Host Nation hazardous material environmental laws/standards. Proper permits for transport and disposal are required.
- Training: Contractor employees must complete Anti-Terrorism (AT) Level I, OPSEC Level I, and iWATCH training.
- Reporting: Annual submission of Service Contract Reports (SCR) via SAM.gov.
- Deliverables: Numerous deliverables are specified, including QCPs, Installation Pass Logs, background check documentation, safety plans, and training certificates.
Contact Information
- Primary Contact: Chance Andre (andre.a.chance2.mil@army.mil)