RECAPITALIZE RUNWAY 1-19 at U.S. COAST GUARD BASE ELIZABETH CITY, NC.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.