Receptacle Assembly for B-52 Aircraft

SOL #: SPRTA1-26-R-0159Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OKLAHOMA CITY, OK
TINKER AFB, OK, 73145-3070, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Miscellaneous Aircraft Accessories And Components (1680)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 13, 2026
2
Last Updated
Feb 2, 2026
3
Response Deadline
Feb 20, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK has issued a presolicitation for the procurement of Receptacle Assemblies (P/N: 5-40674-24, NSN: 1680015448923RK) for B-52 Aircraft. While initially identified as a sole source requirement for Boeing, the agency invites all responsible sources to submit capability statements, proposals, or quotations for consideration. The requirement includes a request for a 25% reduction in production lead time and a 20% reduction in cost. Responses are due February 20, 2026.

Scope of Work

This opportunity seeks to acquire 24 Aerial In-Flight Refueling Receptacles (Aluminum) with a maximum potential quantity of 36. Deliveries are staggered to Tinker AFB, OK (SW3211), with initial shipments beginning March 30, 2026, and concluding by July 30, 2026. Additionally, the contractor will be required to provide a Production Surge Plan and CAP, with delivery by February 19, 2027. The requirement is designated with a "Rising Tide Surge Exercise Priority A."

Contract & Timeline

  • Type: Presolicitation (Anticipated 1-year contract period)
  • Set-Aside: Sole Source (Boeing) with an invitation for all responsible sources to submit.
  • Response Due: February 20, 2026, 21:00 UTC
  • Published: January 13, 2026

Evaluation

In accordance with FAR 5.207(c)(16)(ii), all responsible sources may submit a capability statement, proposal, or quotation, which will be considered by the agency. Key considerations include the ability to meet the requested 25% reduction in production lead time and 20% reduction in cost.

Additional Notes

Electronic procedures will be used for this solicitation. Primary Point of Contact: Dana Craun, dana.craun@us.af.mil, 385-591-1678.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 2
Solicitation
Posted: Feb 2, 2026
View
Version 1Viewing
Pre-Solicitation
Posted: Jan 13, 2026
Receptacle Assembly for B-52 Aircraft | GovScope