Receptacle Assembly for B-52 Aircraft
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK has issued a presolicitation for the procurement of Receptacle Assemblies (P/N: 5-40674-24, NSN: 1680015448923RK) for B-52 Aircraft. While initially identified as a sole source requirement for Boeing, the agency invites all responsible sources to submit capability statements, proposals, or quotations for consideration. The requirement includes a request for a 25% reduction in production lead time and a 20% reduction in cost. Responses are due February 20, 2026.
Scope of Work
This opportunity seeks to acquire 24 Aerial In-Flight Refueling Receptacles (Aluminum) with a maximum potential quantity of 36. Deliveries are staggered to Tinker AFB, OK (SW3211), with initial shipments beginning March 30, 2026, and concluding by July 30, 2026. Additionally, the contractor will be required to provide a Production Surge Plan and CAP, with delivery by February 19, 2027. The requirement is designated with a "Rising Tide Surge Exercise Priority A."
Contract & Timeline
- Type: Presolicitation (Anticipated 1-year contract period)
- Set-Aside: Sole Source (Boeing) with an invitation for all responsible sources to submit.
- Response Due: February 20, 2026, 21:00 UTC
- Published: January 13, 2026
Evaluation
In accordance with FAR 5.207(c)(16)(ii), all responsible sources may submit a capability statement, proposal, or quotation, which will be considered by the agency. Key considerations include the ability to meet the requested 25% reduction in production lead time and 20% reduction in cost.
Additional Notes
Electronic procedures will be used for this solicitation. Primary Point of Contact: Dana Craun, dana.craun@us.af.mil, 385-591-1678.