Reconfigure/Refurbish the Training Room and Office Building for USCG in Buchanan, TN

SOL #: 70Z02926QNEWO003Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE NEW ORLEANS(00029)
NEW ORLEANS, LA, 70117, United States

Place of Performance

Buchanan, TN

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 20, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 22, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) is soliciting quotes for the reconfiguration and refurbishment of a training room and office in Building 6395 at the USCG Cutter Chippewa moorings in Buchanan, TN. This opportunity is a Total Small Business Set-Aside. Quotes are due by April 22, 2026, at 6:00 PM ET.

Scope of Work

The project involves comprehensive interior renovation of approximately 1100 sq. ft. Key tasks include:

  • Replacing/repairing damaged/loose insulation and vapor barrier.
  • Installing new 1/2 inch gypsum sheetrock, including taping, mudding, and finishing, followed by painting.
  • Installing a new acoustic ceiling grid system with new rails, 2'x4' acoustic ceiling tiles, and a mounting plate for an overhead projector.
  • Properly suspending and supporting HVAC ducting, electrical, and other utilities above the new ceiling grid.
  • Installing new HVAC ducting and registers into the new acoustic ceiling grid.
  • Installing fifteen 2'x4' cool white LED panel lights and an appropriately sized breaker, with the light switch relocated to the nearest adjacent wall.
  • Installing eight new electrical receptacles on walls and one new electrical outlet in the ceiling for an overhead projector, each with appropriately sized breakers.
  • Installing four ethernet data ports.
  • Removing four existing exterior windows and installing four new vinyl replacement double-hung windows.
  • Repairing concrete and/or applying self-leveling underlayment to provide a suitable substrate for new Luxury Vinyl Plank Flooring with underlayment throughout the space.
  • Contractor is responsible for providing a dumpster, all cleanup of the project area, and protecting existing equipment and merchandise.

Contract & Timeline

  • Type: Firm-Fixed-Price Purchase Order (Combined Synopsis/Solicitation, Request for Quotation)
  • Set-Aside: Total Small Business Set-Aside (100%)
  • Performance Period: 14 calendar days from notice to proceed, to be completed within 60 calendar days after receiving award.
  • Response Due: April 22, 2026, 6:00 PM ET
  • Published: April 07, 2026

Evaluation

Award will be made to the lowest priced technically acceptable offer. Evaluation factors include:

  • Price
  • Technical Acceptability
  • Past Performance

Additional Notes

A mandatory site visit is required prior to submitting a quote to examine the scope of work, take field measurements, and become familiar with existing conditions. Arrangements for site visits can be made by contacting MKC Southworth Knight at southworth.m.knight@uscg.mil or (706) 410-5764. Quotes, including price, technical approach, and past performance, must be submitted to Joel.S.Ivy@uscg.mil. Offerors must be actively registered in SAM.gov. Payment and performance bonds are not required. This solicitation incorporates Federal Acquisition Regulation (FAR) clauses and Department of Labor Wage Rates for Construction (specifically for Henry County, TN), which bidders must review for compliance and accurate cost estimation.

People

Points of Contact

MKC Southworth KnightSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
View