Redesign Repair of Wastewater Treatment Plant

SOL #: FA4686240014Justification

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4686 9 CONS PK
BEALE AFB, CA, 95903-1702, United States

Place of Performance

ARBOGA, CA

NAICS

No NAICS code specified

PSC

Architect And Engineering Construction: Sewage And Waste Facilities (C1ND)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force has published a Justification and Approval (J&A) for Other Than Full and Open Competition for the Redesign Repair of a Wastewater Treatment Plant at Beale AFB, CA. This action justifies an award to Raymond Pond Full Services Solutions JV, LLC for a design refresh and additional design services, leveraging their unique qualifications as the original designer of record. The estimated value for this action is $1,683,304.08.

Scope of Work

The project involves a design refresh of select treatment units, structural, and architectural features to modernize the facility, improve reliability, and enhance redundancy. Key aspects include:

  • Incorporating a phased construction approach to maintain plant operations.
  • Updating the design to reconcile with current plant conditions, red line drawings, and completed construction.
  • Validating design flows and loadings.
  • Incorporating scope updates.
  • Providing additional design services for upgraded headworks, effluent disposal pump replacement, a 12% sodium hypochlorite system, demolition of anaerobic digesters, drying bed rehabilitation, paving, roof repair, and generator replacement.

Contract Details

  • Type: Justification for Other Than Full and Open Competition (Order placed under FAR Subpart 16.5)
  • Estimated Value: $1,683,304.08
  • Product Service Code: C1ND (Architect And Engineering - Construction: Sewage And Waste Facilities)
  • Place of Performance: ARBOGA, CA (Beale AFB)
  • Published Date: February 27, 2026

Justification for Other Than Full and Open Competition

This action is justified under FAR 16.505(b)(2)(i)(b) & (c). Raymond Pond Full Services Solutions JV, LLC is considered uniquely qualified due to their status as the current designer of record with intimate knowledge of the plant and their previous design. California state regulations require a licensed professional who personally created or supervised a design to seal it, making Raymond uniquely qualified for this design refresh. Market research was not conducted as the contractor is active and in good standing on the AE Next IDIQ contract.

Contact Information

People

Points of Contact

Robert BrineyPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Feb 27, 2026
Redesign Repair of Wastewater Treatment Plant | GovScope