Refurbish 138 KV OCB Breaker
SOL #: FY265281014Combined Synopsis/Solicitation
Overview
Buyer
State
International Boundary And Water Commission: Us Mexico
INTERNAT. BOUNDARY AND WATER COMM.
El Paso, TX, 79902, United States
Place of Performance
Del Rio, TX
NAICS
Switchgear and Switchboard Apparatus Manufacturing (335313)
PSC
Circuit Breakers (5925)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 22, 2026
2
Submission Deadline
Jun 19, 2026, 9:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The International Boundary and Water Commission (IBWC) is soliciting quotes for the refurbishment of a 138 KV Oil Circuit Breaker (OCB) at the Falcon Power Plant, Amistad Power Plant Field Office in Del Rio, TX. This is a 100% Small Business Set-Aside opportunity. The OCB is critical for maintaining power generation to the Electrical GRID. Proposals are due by June 19, 2026, at 3:00 PM Mountain.
Scope of Work
The contractor will provide all labor, materials, equipment, supervision, and management to refurbish the 138 KV OCB. Key tasks include:
- Replacing the air compressor, performing oil change and disposal.
- Replacing worn electrical contact boards, pneumatic, and mechanical parts.
- Sandblasting and painting the OCB tank and enclosure.
- Replacing mechanical hardware connectors for electrical conductors.
- Inspecting and testing insulation resistance, Current Transformers (CT's), and Bushings.
- Removing and disposing of old dielectric oil, and installing new high dielectric strength oil.
- Providing training to power plant personnel on the breaker's function. The work must be completed within 180 calendar days after contract award and include a minimum two-year warranty.
Contract Details
- Solicitation Number: FY265281014 (RFQ)
- Type: Combined Synopsis/Solicitation
- Set-Aside: Total Small Business
- NAICS: 335313 Switchgear and Switchboard Apparatus Manufacturing (Small Business Size Standard: 1,250 employees)
- Place of Performance: Amistad Power Plant Field Office, Del Rio, TX 78840
- Period of Performance: 180 calendar days after contract award.
Key Dates
- Questions Due: June 15, 2026, 3:00 PM Mountain (email to angelica.baca@ibwc.gov)
- Site Visit Deadline: NLT June 10, 2026 (schedule with juan.escobar@ibwc.gov or Evelio.siller@ibwc.gov)
- Proposals Due: June 19, 2026, 3:00 PM Mountain
Submission & Evaluation
- Submission: Email proposals in PDF format to angelica.baca@ibwc.gov, referencing solicitation number FY26R5201028 in the subject line.
- Required Submissions: Active Unique Entity ID (UEI#), Price Sheet, and completed FAR 52.212-3 (Offeror Representations and Certifications-Commercial Items).
- Award Basis: Lowest Price Technically Acceptable (LPTA).
- Technical Acceptability: Based on the Contractor’s Technical Approach (narrative covering plan, equipment, key team members, schedule), Expertise and Qualified Personnel, and Past Performance (at least three references for similar projects). Failure to submit these will result in a non-responsive proposal.
Additional Information
- Contractors are highly encouraged to attend an agency-organized site visit; virtual visits are not permitted.
- The Wage Determination (No. 2015-5303, Revision 31) for the Service Contract Act applies, specifying minimum wage rates and fringe benefits for the region. Bidders must ensure compliance with these labor standards, including Executive Order 13706 (Paid Sick Leave) and 13658 (Minimum Wage).
- The Invoice Processing Platform (IPP) will be used for electronic invoicing.
People
Points of Contact
Angelica BacaPRIMARY
Seone Michael JonesSECONDARY
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 22, 2026