REGION ONE FOREST SERVICE - Lolo Building T150 Reconstruction

SOL #: 1240LU25R0018Pre-Solicitation

Overview

Buyer

Agriculture
Forest Service
Regional Office, R1
MISSOULA, MT, 59804, United States

Place of Performance

Missoula, MT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Office Buildings (Y1AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jul 1, 2025
2
Last Updated
Aug 12, 2025

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This is a PRESOLICITATION announcement. The solicitation is anticipated to be posted to Contract Opportunities on SAM.gov on or around July 15, 2025.

PROJECT DESCRIPTION:  The project consists of repair by replacement of the T150 building through demolition of the existing building and re-construction at the same site. The new building will include open shop space, open storage, fitness room, restrooms and a mezzanine for open storage, minimal site work to include security fencing and access controls, path, and aprons. The new building will accommodate seasonal and full-time employees in the areas of soils, hydrology, regional office fleet, Lolo engine, Lolo hotshots, timber strike, and Lolo D3 storage. The proposed new building base item comprises approximately 13,449 Sq. Ft. of floor space.

The option items of this contract include (1) sitework, (2) pre-engineered metal building, (3) fitness and restroom areas, (4) interior fence partitions, (5) interior ceiling fans, and (6) acoustic wood ceiling clouds.

PROJECT LOCATION:  The project is in Missoula, MT located at Fort Missoula Road, Building T150

PERIOD OF PERFORMANCE:  All work items must be completed 426 days after Notice to Proceed is issued.

MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)):  Between $5,000,000 and $10,000,000. 

BONDING:  All offerors will be required to provide a Bid Bond (20%) with their proposal submission.  Performance and Payment Bonds (100% each) will be required of the successful awardee.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 5
Solicitation
Posted: Aug 12, 2025
View
Version 4
Solicitation
Posted: Aug 8, 2025
View
Version 3
Solicitation
Posted: Aug 4, 2025
View
Version 2
Solicitation
Posted: Jul 16, 2025
View
Version 1Viewing
Pre-Solicitation
Posted: Jul 1, 2025
REGION ONE FOREST SERVICE - Lolo Building T150 Reconstruction | GovScope