REGULATOR,AIR PRESS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued an amendment to a solicitation for the repair of REGULATOR,AIR PRESS (NSN 1660010397911). This amendment primarily extends the solicitation close date to March 30, 2026. The opportunity seeks contractors to return units to a Ready For Issue (RFI) condition.
Scope of Work
This Request for Quote (RFQ), issued in accordance with FAR Part 15, requires the repair, testing, and inspection of REGULATOR,AIR PRESS (P/N 2-54910-507, NSN 1660010397911). The contractor will be responsible for providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Key requirements include:
- Repair Turnaround Time (RTAT): 183 days after receipt of asset.
- Throughput Constraint: Contractor must specify monthly repair capacity.
- Induction Expiration Date: 365 days after contract award date.
- Material Requirements: Use of SAE-AS22759 series wire in lieu of MIL-W-81381. Compliance with IPC/EIAJ-STD-001C for personnel.
- Quality Assurance: Establish and maintain a quality system conforming to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or equivalent.
- Configuration Management: Maintain a plan per NAVSUP WSS clause NAVICPIA18.
- Parts and Materials: Contractor is responsible for supplying all parts and materials, which must be new (FAR 52.211-5) unless approved otherwise. Cannibalization is generally not authorized without specific approval.
- Definitions: Detailed definitions for Overhaul, Repair, Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) are provided, outlining procedures for each scenario.
Contract & Timeline
- Type: Solicitation (RFQ for Repair)
- Set-Aside: None specified.
- Response Due: March 30, 2026, 8:30 PM Z.
- Published: February 27, 2026 (Amendment).
- Submission: Quotes must be submitted via email to owen.m.mcnamara2.civ@us.navy.mil.
- Delivery: Early and incremental deliveries are accepted and preferred.
Additional Notes
Contractual documents are considered issued upon mailing, faxing, or electronic transmission. The Government's acceptance of a proposal constitutes a bilateral agreement for document issuance. Reconciliation modifications will be issued after final inspection and acceptance, with consideration assessed for failure to meet RTAT requirements.