Relocation and Renovation of the JOC/MSP

SOL #: PR15828736Combined Synopsis/Solicitation

Overview

Buyer

State
State, Department Of
US EMBASSY SAN JOSE
WASHINGTON, DC, 20520, United States

Place of Performance

Alajuela, CR-A, Costa Rica

NAICS

Construction of Buildings (236)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 20, 2026
2
Submission Deadline
Mar 5, 2026, 6:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of State (DoS), through the Bureau of International Narcotics and Law Enforcement Affairs (INL), is soliciting proposals for the Relocation and Renovation of the Joint Operations Center (JOC) at Base 2, Alajuela, Costa Rica. This Combined Synopsis/Solicitation seeks construction services to enhance Costa Rica's capacity for managing security incidents within a prison environment. Proposals are due March 5, 2026.

Project Overview

This project involves the comprehensive remodeling of the Joint Operations Center. The objective is to deliver a complete and fully functioning facility, including all necessary construction, systems, and finishes. The work will be performed in cooperation with the Government of Costa Rica.

Scope of Work

The scope includes, but is not limited to:

  • Demolition of existing structures and debris removal.
  • Installation of new flooring, including trenches for electrical/data connections.
  • Installation of suspended ceiling systems, coordinated with other building systems.
  • Wall finishing, including removal of existing finishes, rendering, and PVC skirting.
  • Installation of security and fire systems, such as fire alarm conduits, access doors, biometric/facial recognition systems, and evacuation signage.
  • Fabrication and installation of screen mounting structures.
  • Comprehensive electrical and telecommunications system installations, including conduit, cabling, connections, and extending electrical service, all compliant with applicable codes.
  • The project specifically excludes furniture and the supply of the Main Rack.

Period & Place of Performance

  • Period of Performance: 75 calendar days from the issuance of the Notice to Proceed.
  • Place of Performance: Base 2, Juan Santamaria Airport, Alajuela Province, Costa Rica.

Special Requirements & Compliance

Bidders must meet stringent requirements, including:

  • Submission of CVs for required disciplines, demonstrating professional experience and certifications.
  • A Project Manager/Lead Engineer residing in Costa Rica during construction.
  • Pricing must be inclusive of all direct and indirect costs.
  • Required insurances: Defense Base Act (DBA) (if applicable), Work Risk Insurance Policy, and Civil Liability Insurance.
  • Contractor must be licensed and certified for engineering and construction services in Costa Rica, with local preference given.
  • Adherence to applicable Costa Rica construction codes and/or International Building Codes (IBC).
  • Personnel must be registered with CCSS (Costa Rican Social Security Fund) and INS (National Insurance Institute).
  • Lead Engineers must be registered and licensed by CFIA.
  • Deliverables include a maintenance plan, training, and As-Built Drawings (English/Spanish, PDF/DWG).
  • Monthly Status Reports (MSRs) and Weekly Progress Reports are mandatory.
  • Site reconnaissance and site visits are required, with costs included in the proposal.
  • Compliance with Federal Acquisition Regulations (FAR) is mandatory.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (Construction Services)
  • Set-Aside: None specified.
  • Proposal Due Date: March 5, 2026, 06:00 AM UTC.
  • Published Date: February 20, 2026.

Contact Information

People

Points of Contact

Melvin FernandezPRIMARY
Christian BravoSECONDARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
Relocation and Renovation of the JOC/MSP | GovScope