Remanufacture of B-52s Primary/Secondary Heat Exchangers
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The United States Air Force through Air Force Sustainment Center (AFSC), Tinker AFB 73145 is contemplating the Remanufacture of B-52 Primary/Secondary Heat Exchangers. The contractor shall provide all labor, facilities, equipment and all material to accomplish remanufacture. The work encompasses the disassembly cleaning, inspection, maintenance re-assembly, testing, and finishing actions required to return the item to a like-new condition in accordance with the solicitation requirements and all attachments. A firm fixed price Requirements type contract is contemplated with a 5 year consisting of a 3 year basic and one 2-year option. Please see attached for more information.