Remanufacture of F-15 Rudder and Nose Gear Steering Cartridge Assembly

SOL #: FA811826R0028Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8118 AFSC PZABB
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Miscellaneous Aircraft Accessories And Components (1680)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 17, 2026
3
Submission Deadline
Jul 2, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, through AFSC PZABB, is soliciting proposals for the remanufacture of F-15 Rudder and Nose Gear Steering Cartridge Assemblies. This is a 5-year Firm-Fixed-Price Indefinite Delivery Indefinite Quantity (IDIQ) contract, set aside for Total Small Businesses. The work involves restoring these critical aircraft components to a like-new condition. Proposals are due by July 2, 2026, at 6:00 PM UTC.

Scope of Work

The core task is the comprehensive remanufacture of the F-15 Rudder and Nose Gear Steering Cartridge Assembly (NSN: 1680002493833RK), which is a Line Replaceable Unit (LRU) part of the rudder control and nose gear steering system. This includes disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing. Consumable parts must be replaced 100%. The item is cylindrical, made of aluminum alloy and steel, measuring 17.3 inches in length, 2 inches in width/height, and weighing 1.6 pounds.

Contract Details

  • Contract Type: 5-Year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: S Coffeyville, OK, United States
  • Period of Performance: 5 years
  • Qualification Requirements: Apply to this opportunity. Vendors not previously qualified must submit a Source Approval Request (SAR) package.

Key Requirements & Deliverables

Contractors must adhere to specific requirements, including:

  • Quality System: Establish and maintain a quality system, with DCMA performing acceptance prior to packaging.
  • Initial Production Evaluation (IPE): Must be completed within 60 days of the first delivery order.
  • Reporting: Mandatory reporting via the Commercial Asset Visibility Air Force (CAV AF) system for Government-owned assets, including daily status, transactions, and discrepancies. Other required reports include Monthly Production Reports (DI-PSSS-81995A), Government Property Inventory Reports (DI-MGMT-80441D), and Shipping/Packaging Discrepancy Reports (SF 364).
  • Supply Chain Risk Management (SCRM): Develop and implement a SCRM plan covering COOP, Foreign Influence, and Cybersecurity.
  • Item Unique Identification (IUID): Marking required per MIL-STD-130 and specific technical orders (TO 4SA10-4-3).
  • Production Surge Plan: Develop a plan (DI-MGMT-80969) to address potential 20% increase in demand.
  • Technical Data Package (TDP): Deliverable (DI-SESS-80776B) required 18 months after contract award.
  • Packaging: Compliance with MIL-STD-129 and MIL-STD-2073-1, including Wood Packaging Material (WPM) restrictions.
  • Transportation: Adherence to F.O.B. Origin terms and mandatory use of the Procurements Integrated Enterprise Environment (PIEE) for vendor transportation instructions.

Submission & Evaluation

  • Evaluation Basis: Price Only, with award going to the offeror with the lowest total evaluated price. Price reasonableness and balance will be assessed.
  • Proposal Due Date: July 2, 2026, 6:00 PM UTC.
  • Submission: Offerors must complete Blocks 13 and 27 of the SF1447 and ensure proposals are compliant with all solicitation requirements.

Contact Information

  • Primary Contact: Morgan Mcgarity (morgan.mcgarity@us.af.mil)
  • Secondary Contact: Matthew Churchwell (matthew.churchwell.2@us.af.mil)
  • Technical Data: Requests for technical data must be submitted via email to Morgan McGarity. Drawings can be accessed via A-Team using DD Form 2875.

People

Points of Contact

Morgan McgarityPRIMARY
Matthew ChurchwellSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Jun 17, 2026
View
Version 2Viewing
Solicitation
Posted: Jun 4, 2026
Version 1
Solicitation
Posted: May 4, 2026
View