Remodeling of GYM at the U.S. Embassy Marine House
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of State, through the U.S. Embassy Vienna, has issued a Presolicitation for the remodeling of the Gym/Fitness room at the U.S. Embassy Marine House in Vienna, Austria. This project involves expanding the gym from 55m2 to 62m2, including demolition and renovation work. The indicative construction schedule is 5 weeks in fall 2026. Responses are due by July 29, 2026.
Scope of Work
This opportunity seeks a General Contractor for comprehensive construction and electrical installation services. The scope includes:
- Demolition: Partition walls, wall coverings, doors, wooden cabinet, electrical installations, existing wall/floor tiles, sanitary items, PVC flooring, and ceiling lights.
- Refurbishment: Plastering, leveling, cleaning, priming, and painting walls and ceilings; cleaning, grinding, and leveling floors with new PVC flooring in the demolition area; delivery and assembly of 6 new ceiling lights with integration into the existing system.
- Special Requirements: Work must be conducted while the facility remains operational and residents are present, minimizing disturbance. Adherence to USG Security regulations, including clearance processes for personnel, vehicles, and materials, and implementation of safety and protective measures.
Contract & Timeline
- Type: Presolicitation
- Product Service Code: Z1FC - Maintenance Of Troop Housing Facilities
- Set-Aside: None specified
- Response Due: July 29, 2026, 08:00 AM Z
- Published: June 11, 2026
- Place of Performance: U.S. Embassy Marine House, Vienna, Austria
- Anticipated Construction: 5 weeks in Fall 2026
Additional Notes
This notice is for planning purposes and to gauge interest for the upcoming solicitation. Interested parties should monitor SAM.gov for the formal solicitation release.