Z--REMOVE DISCONTINUED CABLEWAYS

SOL #: 140G0326Q0074Combined Synopsis/Solicitation

Overview

Buyer

Interior
Us Geological Survey
OFFICE OF ACQUISITON GRANTS
SACRAMENTO, CA, 95819, United States

Place of Performance

Place of performance not available

NAICS

Site Preparation Contractors (238910)

PSC

Maintenance Of Other Non Building Facilities (Z1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 27, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 24, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Geological Survey (USGS), Arizona Water Science Center, is soliciting proposals for the dismantling and removal of discontinued cableway structures at two field locations: Cibecue Creek and Carrizo Creek. This is a Combined Synopsis/Solicitation for commercial services. A mandatory site visit is scheduled for April 7, 2026, and proposals are due April 24, 2026, by 05:00 PM (PDT).

Scope of Work

This requirement involves the complete dismantling and removal of two discontinued cableway structures, including cables, saddle blocks, U-bars, A-frames, and all associated equipment. The contractor must haul away all debris, cut U-bars at the concrete surface, and return the areas to as close to natural as possible. Work is solely for dismantling and removal, not construction or alteration. Compliance with all applicable safety and environmental regulations, including OSHA, is mandatory.

The work will be performed on White Mountain Apache Tribe lands. The contractor must coordinate site access in advance and will be escorted by Tribal and USGS representatives. Tribal Employment Rights Office (TERO) requirements of the White Mountain Apache Tribe apply, and the contractor is responsible for direct coordination with the Tribal TERO office for compliance, fees, reporting, and workforce provisions.

An additional cable segment (approx. 4 feet) at the Carrizo Creek site requires removal and disposal. Offerors must provide a separately priced option (Option Item 00030) for this work, which the Government may exercise at its discretion.

Contract & Timeline

  • Contract Type: Implied Firm-Fixed-Price.
  • Period of Performance: 90 calendar days after Notice to Proceed, estimated from May 4, 2026, to August 4, 2026.
  • Product/Service Code: Z1PZ (Maintenance Of Other Non Building Facilities).
  • Labor Standards: Service Contract Labor Standards (SCLS) apply (Wage Determination 2015-577, Rev. 12/03/2025). The Davis-Bacon Act does not apply.
  • Contractor Ownership: The contractor retains ownership of all removed materials; any salvage value is incidental.
  • Invoicing: Electronic invoicing and payment will be through the Internet Payment Platform (IPP).

Eligibility & Set-Aside

  • Set-Aside: Not a small business set-aside.
  • Requirements: Offerors must provide pricing for both sites; partial quotes will not be accepted. A separately priced option for the additional cable removal at Carrizo Creek is also required.

Submission & Evaluation

  • Proposal Due Date: April 24, 2026, 05:00 PM (PDT).
  • Submission Method: Via email to Joel Berberena, Contracting Officer (joel_berberena@ios.doi.gov).
  • Proposal Requirements: Signed SF-18, firm-fixed-price quote for both sites, technical capability statement, relevant representations/certifications (e.g., FAR 52.212-3), and the separately priced option for additional cable removal.
  • Evaluation Criteria: Award will be made on an all-or-none basis to the responsible offeror whose offer is most advantageous, considering price, technical capability, and past performance.

Key Deadlines

  • Site Visit RSVP: No later than April 3, 2026.
  • Mandatory Site Visit: April 7, 2026 (Cibecue Creek: 9:30 AM - 12:00 PM; Carrizo Creek: 1:30 PM - 3:30 PM).
  • Questions Due: April 14, 2026.
  • Proposal Due: April 24, 2026.

Contact

Joel Berberena, Contracting Officer, jberberena@usgs.gov.

People

Points of Contact

Berberena, JoelPRIMARY

Files

Files

Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View