Y--Renewal of Fort Point Restrooms, GOGA

SOL #: 140P8626Q0011Award Notice

Overview

Buyer

Interior
National Park Service
PWR GOGA(86000)
SAN FRANCISCO, CA, 94123, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Apr 24, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is soliciting quotations for the renewal of restrooms at Fort Point, Golden Gate National Recreation Area (GOGA). This project involves comprehensive renovation of the existing facilities. This is a Total Small Business Set-Aside. Quotations are due Thursday, April 9, 2026, at 12:00 PM PDT.

Scope of Work

The contractor will provide all supervision, labor, equipment, testing, and supplies for the renovation. Key tasks include:

  • Window Replacement: Matching existing size, operation, finish, glazing, and configuration.
  • Restroom Fixtures: Replacement of sinks, urinals, toilets, soap dispensers, hygiene boxes, mirrors, and baby changing stations.
  • Painting: Interior and exterior painting, including gutters and downspouts where previously painted. Fixing broken siding on the back of the building.
  • Interior Flooring: Cleaning, prep, and recoating of existing epoxy floors (substrate repairs not included).
  • Exterior Lighting: Replacement of six outdoor lights.
  • Drinking Fountain: Replacement of an outdoor drinking fountain.
  • Toilet Compartments: Replacement of partitions with stainless steel.
  • Signage: Replacement of restroom signage.
  • Mobilization/Demobilization: Including provision of four temporary portable toilets (at least one ADA compliant) for public use during construction. An option item for "Replacement of Copper Grate" is also included. The work site is within a historic park area, requiring protection of historic and natural features.

Contract Details

  • Contract Type: Firm-fixed-price purchase order.
  • Estimated Value: Between $25,000 and $100,000.
  • Period of Performance: Work to commence within 10 calendar days after notice to proceed and complete within 60 calendar days thereafter.
  • Set-Aside: Total Small Business Set-Aside.

Submission & Evaluation

  • Submission Deadline: Thursday, April 9, 2026, at 12:00 PM PDT.
  • Submission Method: Electronically via email to Quinn Rankin (Quinn_Rankin@ios.doi.gov).
  • Evaluation Criteria: Award will be made to the responsible quoter whose quotation is most advantageous to the Government, considering:
    1. Price
    2. Relevant Experience
    3. Past Performance
    4. California Contractor State License (a "B" General Building Contractor license is required).
    5. Technical Approach

Important Notes & Clarifications

  • Licensing: Contractors must hold a "B" General Building Contractor license in California.
  • Bonds: A payment bond is required for awards over $35,000; both payment and performance bonds are required for awards over $150,000. A bid bond is not required.
  • Insurance: Liability insurance is required prior to work commencement.
  • Wage Rates: Davis-Bacon Wage Rates apply (refer to Attachment 3).
  • Site Conditions: The existing electrical panel is functional; new connections for sinks/urinals are needed but extensive electrical work is not anticipated. Temporary fencing is required, and the contractor is responsible for its provision and maintenance.
  • Revised Specifications: Bidders must refer to the REVISED Attachment 1 Construction Specifications (posted March 30, 2026) and Attachment 5 Questions & Answers for full details and clarifications.

People

Points of Contact

Rankin, QuinnPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Award Notice
Posted: Apr 24, 2026
Version 3
Solicitation
Posted: Mar 30, 2026
View
Version 2
Solicitation
Posted: Mar 26, 2026
View
Version 1
Solicitation
Posted: Mar 9, 2026
View
Y--Renewal of Fort Point Restrooms, GOGA | GovScope