Renovate Headhouse/Greenhouse In El Reno, OK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) is soliciting Firm Fixed-Price quotations for the Renovation of the Headhouse and Greenhouse (EC04) facilities in El Reno, OK. This opportunity, Solicitation 1232SA26Q0348, is a Historically Underutilized Business (HUBZone) Set-Aside. A mandatory site visit was required on April 15, 2026, meaning only attendees can submit a technically acceptable proposal. Quotations are due by May 5, 2026, at 5:00 PM CST.
Scope of Work
This project involves renovating the EC04 Headhouse and Greenhouse to restore full operations. The scope includes:
- Renovation of the EC04 Headhouse/Greenhouse.
- West Greenhouse Renovation.
- East Greenhouse Renovation (Option).
- Generator Replacement (Option).
- Headhouse Lights and Mechanical Replacement (Option). Detailed architectural and engineering drawings, including demolition and new construction plans for plumbing, mechanical, electrical, and HVAC systems, are provided. An asbestos and lead-containing paint inspection report indicates no asbestos or lead in sampled areas, but bidders should assume lead in unsampled painted surfaces.
Contract Details
- Contract Type: Firm Fixed-Price Request for Quotation (RFQ).
- Set-Aside: Historically Underutilized Business (HUBZone) Set-Aside.
- NAICS Code: 236220 Commercial and Institutional Building Construction, with a small business size standard of $45M.
- Period of Performance: 180 days after Notice to Proceed (NTP). The NTP will be issued after approval of on-site submittals. The initial POP of 6/1/26-5/1/27 is an estimate; if NTP is 8/1/2026, completion is January 29, 2027. Option 3 (Generator Replacement) may add up to 60 days.
- Evaluation: Lowest Priced Technically Acceptable (LPTA).
Key Dates & Actions
- Mandatory Site Visit: April 15, 2026, at 10:00 AM CST (already occurred).
- Questions Due: April 21, 2026, at 5:00 PM EST. Submit via email to david.hildebrand@usda.gov.
- Quotation Due: May 5, 2026, at 5:00 PM CST. Submit via email to david.hildebrand@usda.gov with "RFQ 1232SA26Q0348" in the subject line.
Submission Requirements
Offerors must submit:
- Completed SF 1442 (acknowledging Amendment 0001).
- SF 24 Bid Bond (20% of proposed price, not to exceed $500,000).
- Two relevant experience references.
- Transmittal summary letter. Offerors must be registered in SAM.gov. Amendment 0001 updated the NAICS description and size standard; acknowledgment is mandatory for technical acceptability. Updated wage rates (OK20260041 Mod 1) are also provided.