RENOVATION OF BQ BUILDING #722 AT CFA CHINHAE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVFACSYSCOM FAR EAST is soliciting quotations for the Renovation of BQ Building #722 at CFA Chinhae, South Korea. This is a Firm Fixed Price opportunity for labor, materials, equipment, transportation, and supervision. The project requires completion within 180 calendar days of award. Quotations are due by June 25, 2026.
Scope of Work
This Request for Quotation (RFQ) requires the contractor to perform comprehensive renovation work on BQ Building #722 at CFA Chinhae. The scope includes providing all necessary labor, materials, equipment, transportation, and supervision. Work must adhere strictly to the provided plans and specifications, as well as the Statement of Work dated May 27, 2026, and NAVFAC DWG/SKETCH # 17369548~17369551.
Contract & Timeline
- Type: Firm Fixed Price (FFP) for supplies and services.
- Set-Aside: Not a small business set-aside.
- Response Due: June 25, 2026, 02:00 PM KST.
- Published: June 7, 2026.
- Performance Period: 180 calendar days from contract award.
Submission & Evaluation
- Submission: Quotations must be sent to Naval Facilities Engineering Systems Command Far East, Facilities Engineering Acquisition Division (FEAD) Chinhae, Building #613 (Attn: Mr. Kim, Yun Ju), PSC 479, FPO AP 96269-1100.
- Registration: Offerors must be registered in beta.SAM.
- Pricing: Quotations must be priced exclusively in Korean Won, and payment will also be made in Korean Won. No cost breakdown other than the total price should be submitted.
- Award Basis: Award will be made to the quoter whose submission is most advantageous to the Government, based on price.
- Required Documents: Offerors must provide a completed SF18 Pages 1 and 2, their most recent Stock Change Certificate, and a Certified Copy of Register. Failure to submit these documents will result in non-responsiveness.
- Acceptance Period: The government has a 120-day acceptance period for offers.
Additional Notes
- Site Visit: A site visitation is scheduled for June 16, 2026, at 10:00 A.M. at the Main Gate of CFA Chinhae.
- Offerors are required to acknowledge any amendments issued.
- The government reserves the right to eliminate quotes that do not conform to the solicitation.
- Contact: Yun Kim (yun.c.kim4.ln@us.navy.mil, 3157635871).