Repair ADM Baker Pool Complex
SOL #: NAVMWR-26-R-0029Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
COMMANDER NAVY INSTALLATIONS CMD
MILLINGTON, TN, 38055-6500, United States
Place of Performance
San Diego, CA
NAICS
Fitness and Recreational Sports Centers (713940)
PSC
Recreational And Gymnastic Equipment (7830)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Mar 12, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 14, 2026, 8:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy is soliciting proposals for the Repair of the ADM Baker Pool Complex in San Diego, CA. This project involves significant renovations to meet high demand and ensure safety, including upgrading the main pool, converting a wading pool into a splash pad, and renovating the snack bar and locker room. Proposals are due May 14, 2026.
Scope of Work
The project encompasses comprehensive upgrades to the ADM Baker Pool Complex. Key elements include:
- Upgrading the main pool.
- Converting an existing wading pool into a splash pad (approximately 800 sq ft, targeting ages 0-5, with potential for more units).
- Renovating the snack bar and locker room facilities.
- Installation of a new slide pump if the existing one is inoperable.
- Consideration for a 2,500-gallon water tank for the splash pad, meeting national codes.
- Integration of the splash pad treatment system within the current mechanical room, with 3-phase power available.
- The wading pool plumbing is separate from the lap pool.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Not specified
- Response Due: May 14, 2026, 8:00 PM UTC
- Published: April 29, 2026 (latest amendment)
Key Updates & Amendments
- Amendment 0001 provided details for a pre-proposal conference held on March 26, 2026.
- Amendment 0002 added the minutes from the pre-proposal meeting.
- Amendment 0003 extended the proposal due date from April 26 to May 14, 2026.
- Amendment 0004 addressed initial Requests for Information (RFIs), clarifying that as-builts for buildings are unavailable and identifying the fiber optic point of contact.
- Amendment 0005 provided further RFI responses, including details on site visits for specific components (fiber optic, slide, suction pipe, mechanical building, power source), clarification on shade structures, slide pump status, pool depth (12 ft where slide enters), splash pad specifications, water tank requirements, and warranty expectations.
Contact Information
- Primary Contact: Alanna Young, Contracting Officer
- Email: alanna.g.young.naf@us.navy.mil
- Phone: 9015740848
People
Points of Contact
Alanna Young, Contracting OfficerPRIMARY
Files
Versions
Version 7Viewing
Solicitation
Posted: Apr 29, 2026
Version 6
Solicitation
Posted: Apr 22, 2026
Version 5
Solicitation
Posted: Apr 21, 2026
Version 4
Solicitation
Posted: Apr 13, 2026
Version 3
Solicitation
Posted: Mar 27, 2026
Version 2
Solicitation
Posted: Mar 24, 2026
Version 1
Solicitation
Posted: Mar 12, 2026