Repair Arctic Foundation Bldg 4002 (WWCX 15-1009) Pituffik Space Base, Greenland
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The work includes repairs to the arctic foundation of B4002 as indicated in the drawings and incidental related work. Contractor shall clear arctic ducts and headers of any debris within the areas that are causing more than 10% blockage of the airflow. Contractor shall provide all new dampers, actuators, motors, controllers, equipment, and all associated appurtenances as required for a complete and usable system per the drawings and specifications. Provide all material as needed and as shown in the drawings for a complete and usable facility. Contractor shall provide for an additional 10% of the number of bolts, nuts, and washers for the arctic air stacks (AAS) for bench stock to the base maintenance contractor. Contractor shall provide 10% additional dampers and actuators for bench stock to the base maintenance contractor. All bench stock materials shall be properly labeled with the project number, building number, date, and short description of function.