Repair BEQ FC555
SOL #: N4008526R9043Combined Synopsis/Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States
Place of Performance
Camp Lejeune, NC
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jun 12, 2026
2
Submission Deadline
Jul 13, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for the Repair BEQ FC555 project at MCB Camp Lejeune, NC. This Total Small Business Set-Aside opportunity is restricted to pre-qualified General MACC Contractors listed on the General Requirements cover page. The project involves comprehensive renovation and repair of Bachelor Enlisted Quarters (BEQ) FC555, with an estimated value between $25,000,000 and $100,000,000. Proposals are due July 13, 2026, at 2:00 PM EST.
Scope of Work
This extensive project encompasses a wide range of repair and renovation tasks for BEQ FC555, including:
- Interior Renovations: Finishes, partitions, specialties, and structural interior design adhering to Navy & Marine Corps and UFC codes.
- Building Systems: Upgrades to HVAC, plumbing, electrical, and telecommunications systems.
- Fire Protection: Demolition of existing systems and installation of new NFPA 13R wet-pipe sprinkler and combined fire alarm/mass notification systems.
- Site Improvements: Milling, overlaying, and striping of the parking lot; replacement of sidewalks; landscaping; and earthwork, including subgrade preparation and pavement design.
- Demolition & Construction: Demolition of existing mechanical building FC556, construction of a new mechanical building, and a new trash dumpster enclosure.
- Hazardous Material Abatement: Removal, handling, and disposal of identified asbestos-containing materials (ACMs), lead-based paint (LBP), and mold. Procedures for unforeseen asbestos, lead, unsuitable soil, and buried utilities are also included.
- Compliance: Adherence to numerous codes and standards (UFC, IBC, NFPA, LSC) and environmental regulations for MCB Camp Lejeune.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (RFP)
- Set-Aside: Total Small Business (FAR 19.5), restricted to pre-qualified General MACC Contractors.
- Estimated Value: $25,000,000 - $100,000,000
- Period of Performance: 910 days after award.
- Liquidated Damages: $880 per Calendar Day.
- Bonds: Bid bonds, payment bonds, and performance bonds are required for proposals $150K and greater; payment bonds for $35K and greater.
- Wage Determination: General Decision Number NC20260010 5/18/2026 applies.
- Requirements: Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage), and Buy American Requirement-Construction Materials Under Trade Agreements apply.
Submission & Evaluation
- Proposal Due Date: July 13, 2026, at 2:00 PM EST.
- RFIs Cut-off: June 29, 2026, at 2:00 PM EST.
- Basis for Award: Lowest Price.
- Proposal Acceptance Period: 60 days from receipt of offers.
- Mandatory: Offers must be submitted on all line items, and ELINs must include all markups.
- Site Visit: Will be scheduled via amendment.
- Note: Funding may not become available, and no award will be made if funds are not available. Offerors will not be reimbursed for proposal costs.
Contacts
- Primary: Jessica Huebner (jessica.r.huebner.civ@us.navy.mil, 9104515892)
- Secondary: Lauren Loconto (lauren.f.loconto.civ@us.navy.mil, 9104515916)
People
Points of Contact
Jessica HuebnerPRIMARY
Lauren LocontoSECONDARY
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 12, 2026