REPAIR CRACKS AND SPALLS B43131

SOL #: FA527025R0011Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Ammunition Facilities (Z2EA)

Set Aside

Local Area Set-Aside (FAR 26.2) (LAS)

Timeline

1
Posted
Mar 31, 2025
2
Last Updated
Jun 18, 2025
3
Response Deadline
Apr 15, 2025, 5:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This project shall accomplish a design-build repair of B43131. Repair cracks and spalls on concrete 
walls, beams, columns, roof, floor slab, and eaves. Install concrete jackets to repair columns 
along gridlines.Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceeds 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected 
to repair work and restore original appearance. Demolish and dispose of waste material as 
appropriate. Abate and dispose of Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). 
Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). 
Sustainable principles, to include life cycle cost- effective practices shall be integrated into 
the design, development, and construction of the project(s) in accordance with the latest version 
of UFC 1-200-02, High Performance and Sustainable Building Requirements.Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
 

People

Points of Contact

Victor T. Cannon Jr.PRIMARY
DANIEL RAKOWSKISECONDARY

Files

Files

Download

Versions

Version 3Viewing
Pre-Solicitation
Posted: Jun 18, 2025
Version 2
Pre-Solicitation
Posted: May 29, 2025
View
Version 1
Pre-Solicitation
Posted: Mar 31, 2025
View
REPAIR CRACKS AND SPALLS B43131 | GovScope