Repair Fire Alarm System Ant Dulac
SOL #: 41966Q260000004Combined Synopsis/Solicitation
Overview
Buyer
Homeland Security
Us Coast Guard
BASE NEW ORLEANS(00029)
NEW ORLEANS, LA, 70117, United States
Place of Performance
LA
NAICS
Electrical Contractors and Other Wiring Installation Contractors (238210)
PSC
Installation Of Equipment: Fire Fighting, Rescue, And Safety Equipment; And Environmental Protection Equipment And Materials (N042)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 1, 2026
2
Submission Deadline
May 18, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG), under the Department of Homeland Security, is soliciting quotes for the Repair and Modernization of the Fire Alarm System at USCG ANT Dulac, LA. This is a Total Small Business Set-Aside opportunity for a Firm-Fixed Price Construction Contract. The project involves upgrading the existing Notifier fire alarm system to ensure crew safety and property protection. Quotes are due by May 18, 2026, at 12:00 pm CST.
Scope of Work
The contractor will be responsible for modernizing the fire alarm system by replacing the obsolete control panel and associated components. Key tasks include:
- Removal: Demolition and removal of the old fire alarm control panel, power supply, detectors, and pull stations.
- Installation: Furnishing and installing a new fire alarm control panel, power supply, various detectors (smoke, heat, duct), relay/control/monitor modules, a cellular communicator, and all necessary wiring.
- Services: Providing annual fire alarm monitoring, verifying proper operation and testing, scheduling final inspection with the Louisiana State Fire Marshal, providing an NFPA 72 Certificate of Compliance, and completing a function test with the USCG POC.
- Spares: Furnishing 5 extra heat detectors and 5 extra smoke detectors. All work must meet or exceed manufacturer specifications and industry standards, and comply with NFPA 72. The period of performance is not to exceed 60 calendar days from the date of award.
Contract Details
- Contract Type: Firm-Fixed Price Construction Contract.
- Set-Aside: Total Small Business Set-Aside.
- NAICS Code: 238210 (Electrical Contractors and Other Wiring Contractors) with a $16.5M size standard.
- Delivery: 30 Days After Receipt of Order (ARO).
- FOB Destination: U.S. Coast Guard ANT DULAC, 241 Coast Guard Rd., Dulac, LA. 70353-2141.
- Applicable Regulations: Federal Acquisition Regulation (FAR) Clauses and Department of Labor Wage Rates for Construction are included. FAR Part 36 provisions are tailored for this Request for Quotation (RFQ). Performance and Payment Bonds are required.
Submission & Evaluation
- Evaluation Factors: Award will be based on the Lowest Price, Technically Acceptable (LPTA) method, considering Price, Technical Acceptability, and Past Performance.
- Submission Deadline: Quotes are due by May 18, 2026, at 12:00 pm CST.
- Submission Method: Submit quotes via email to Clarence.henshawjr@uscg.mil.
- Questions Deadline: Questions regarding the Scope of Work must be submitted in writing by May 18, 2026, at 12:00 pm CST to joseph.a.fodor@uscg.mil, with a copy to Clarence.henshawjr@uscg.mil.
Eligibility & Site Visit
- Registration: Offerors must be actively registered in the System for Award Management (SAM.gov).
- Site Visit: A site visit is urged and expected to inspect the performance location. Contact MK1 Joey Fodor (COR) at joseph.a.fodor@uscg.mil or (619) 733-1066 to schedule. Failure to inspect the site will not constitute grounds for a claim after award.