Repair FTD Building Envelope 539-25-509

SOL #: 36C25026Q0047Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
250-NETWORK CONTRACT OFFICE 10 (36C250)
DAYTON, OH, 45428, United States

Place of Performance

Cincinnati, OH

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Hospitals And Infirmaries (Z2DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Nov 25, 2025
2
Last Updated
Jan 21, 2026
3
Submission Deadline
Jan 7, 2026, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The “Repair FTD Building Envelope” project includes infrastructure upgrades to ensure consistent operation of the Fort Thomas Domiciliary. These upgrades include the reparation of the degrading parapet roof with comprehensive waterproofing and structural repairs, integration of a compliant lightning protection system as well as the front patio accent wall restoration.

This construction project requires general contracting survey, and minor demolition of existing conditions, structural framing, waterproofing, electrical grounding and finishing services. This includes but is not limited to water infiltration, structural failure, lightning damage, and protection from environmental hazards such as moisture penetration, energy inefficiencies, and potential safety hazards.

Primary focus will be on the perimeters of the roof penthouses, roughly 700 LF.

The second part of the project correcting the deficiencies of the front patio accent wall by removing current accent wall and using a matching spray concrete for the entire perimeter of the exterior patio base, amounting to approximately 870 sq. ft.

The project requires a phased approach to ensure minimal disruption to Ft. Thomas operations. Work will be coordinated with the COR to schedule activities that may require temporary utility shutdowns, closures, or weekend work to prevent operational impact.

See attached Files “FtThomas” to show locations of interest for Ft. Thomas Penthouse repairs and front patio repairs.

People

Points of Contact

Samuel GalbreathPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Jan 21, 2026
View
Version 3Viewing
Solicitation
Posted: Dec 31, 2025
Version 2
Solicitation
Posted: Nov 25, 2025
View
Version 1
Solicitation
Posted: Nov 25, 2025
View
Repair FTD Building Envelope 539-25-509 | GovScope