REPAIR INTERIOR CEILING, B224

SOL #: FA527025R0009Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

No set aside specified

Timeline

1
Posted
May 30, 2025
2
Submission Deadline
Jun 30, 2025, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

PROJECT REQUIRMENTA) This project shall accomplish a design-build repair the true ceiling of B224. Work includes full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and cracks. Include any site preparation work such as temporary removal of the suspended ceiling, lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.B) The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or other hazardous building materials.C) The Contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion.D) The detailed Scope of Work is described here-in below and the attached supporting documents.E) Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements through 718th Civil Engineer Squadron (718 CES)

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 1Viewing
Solicitation
Posted: May 30, 2025
REPAIR INTERIOR CEILING, B224 | GovScope