Z--Repair of Fuel System at Bighorn Canyon
SOL #: 140P1426Q0050Combined Synopsis/Solicitation
Overview
Buyer
Interior
National Park Service
IMR NORTHERN ROCKIES(12200)
YELWSTN NL PK, WY, 82190, United States
Place of Performance
Place of performance not available
NAICS
Oil and Gas Pipeline and Related Structures Construction (237120)
PSC
Repair Or Alteration Of Fuel Supply Facilities (Z2NA)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Mar 31, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 20, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), specifically IMR Northern Rockies, is seeking proposals for the repair and alteration of the fuel system at Ok-a-Beh Marina, Bighorn Canyon National Recreation Area in Fort Smith, Montana. This 100% Total Small Business Set-Aside opportunity involves replacing critical electrical components and exposed fuel piping. Proposals are due April 20, 2026, at 1:00 p.m. MDT.
Scope of Work
The objective is to replace critical electrical monitoring components and above-ground fuel piping for the Ok-a-Beh Marina fuel system due to repeated failures and non-compliance. Key tasks include:
- Mobilization and Coordination: Coordinate with NPS Project Manager and Crow Tribe concession operator, develop work schedule, conduct pre-work site visit and safety briefing.
- Removal and Decommissioning: Safely decommission existing electrical components and remove approximately 75 linear feet of flexible fuel piping, ensuring proper disposal.
- Installation of Electrical Components: Install new Automatic Tank Gauge (ATG), leak detection probe, remote communication unit, and an electrical disconnect sleeve.
- Fuel Piping Installation: Install approximately 130 linear feet of marina-grade, UL-listed fuel piping, including two fuel line disconnects.
- Testing and Commissioning: Conduct leak detection, electrical, and communication system performance tests.
- Site Restoration: Restore disturbed areas and remove all debris. All work must comply with NPS standards, OSHA, and applicable federal, state, and local codes.
Contract Details
- Contract Type: Firm Fixed Price
- NAICS Code: 237120 (Oil and Gas Pipeline and Related Structures Construction) with a $45M size standard.
- Set-Aside: 100% Total Small Business Set-Aside.
- Period of Performance: May 4, 2026, to September 30, 2026.
Submission & Evaluation
- Quotations Due: April 20, 2026, at 1:00 p.m. Mountain Daylight Time.
- Submission Method: Via email to Stacy_Vallie@nps.gov.
- Evaluation Factors: Award will be made to the most advantageous offer based on:
- Price
- Technical Capability: Including Quality Control, Safety, Management/Key Personnel, proposed on-site supervisor, staffing coverage, communication procedures, and employee accountability (requires a project narrative, max 2 pages).
- Prior Experience: At least three prior projects of similar size and scope.
- Eligibility: Offerors must be registered in SAM and registered as a small business at the time of submission, award, and throughout contract performance.
Key Information
- A site visit is scheduled for April 8, 2026, at 10:00 a.m. MDT at the Ok-a-Beh Marina.
- Applicable FAR clauses and provisions are incorporated by reference.
- Attachments include the Scope of Work, SCA Wage Determination, and Limitations on Subcontracting Report.
People
Points of Contact
Vallie, StacyPRIMARY
Files
Versions
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 31, 2026