Repair of Greenhouse and Headhouse Drainage Issues - Small Grains and Potato Germplasm Research Unit
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture (USDA), Agricultural Research Service (ARS), is soliciting quotations (RFQ 1232SA26R0034) for the Repair of Greenhouse and Headhouse Drainage Issues at the Small Grains and Potato Germplasm Research Unit in Aberdeen, Idaho. This is a Total Small Business Set-Aside. Quotations are due June 26, 2026, at 4:00 PM MT.
Scope of Work
The contractor shall provide all labor, materials, equipment, and supervision to repair greenhouse and headhouse drainage issues. Work must adhere to attached drawings, specifications, and Wage Determination ID20260021, Mod. 2, dated 5/18/2026.
Contract Details
- Contract Type: Firm-Fixed Price Construction Contract
- Set-Aside: Total Small Business Set-Aside (NAICS 236220, Size Standard $45 Million)
- Period of Performance: 120 calendar days from issuance of the Notice to Proceed. Performance must begin within 10 calendar days after award.
- Place of Performance: Small Grains and Potato Germplasm Research Unit, Aberdeen, ID 83210.
- Bonds: Performance and Payment Bonds are required within 10 calendar days after award.
Submission & Evaluation
- Submission Deadline: June 26, 2026, at 4:00 PM MT.
- Submission Method: Electronically via email in Adobe PDF format.
- Required Content: Itemized cost breakdown (materials, labor, equipment, overhead, profit, sales tax). Cumulative overhead and profit for all subcontractors and the prime contractor shall not exceed 30 percent; for prime contractors only, it shall not exceed 20 percent. Pricing for all items in the Schedule of Items is mandatory.
- Evaluation: Award will be based on best value – lowest price technically acceptable.
- Offer Validity: Offers must be held firm for 90 calendar days from the due date.
- Requirements: Active SAM.gov registration is mandatory. Supporting documentation demonstrating how quoted products meet the Statement of Work is required.
Important Dates & Actions
- Site Visit: June 16, 2026, at 10:00 a.m. MT. Attendees must be U.S. Citizens and possess a REAL ID.
- Questions Due: Submit questions via email no later than 72 hours prior to the close date.
- Contact: Angela B. Wingert, angela.wingert@usda.gov, 301-504-1181.
Wage Determination
Attachment 26 (ID20260021, Mod. 2, dated 05/18/2026) outlines prevailing wage rates and fringe benefits for building construction in specific Idaho counties. Bidders must incorporate these labor costs into their proposals for compliance.