Repair of Irrigation Well 2 with Liner and Pump

SOL #: 1232SA26Q0541Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Water Supply Facilities (Z2NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 29, 2026
2
Submission Deadline
May 27, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Agricultural Research Service (ARS) is seeking quotations for the Repair of Irrigation Well 2 with Liner and Pump at its Bushland, TX facility. This is a Combined Synopsis/Solicitation (RFQ) issued as a Total Small Business Set-Aside. The project aims to restore the well's functionality and extend its service life. Quotations are due by May 27, 2026, at 10:00 AM Central Time.

Scope of Work

The project involves comprehensive repair of Irrigation Well 2, which has a failing pump and a compromised casing. Key tasks include:

  • Replacing the existing pump with a new 20 hp pump (approx. 180 gpm at 340 ft TDH).
  • Installing a steel liner, consisting of 280 feet of 8-inch carbon steel casing and 60 feet of 8-inch stainless steel screen.
  • Adding appropriate gravel to the annulus between the liner and original casing.
  • Installing a 480-120/240 2 KVA outdoor-rated transformer and a circuit breaker enclosure with four 120V outlets.
  • Bailing the well to 340 feet to remove accumulated gravel.
  • Utilizing existing 4-inch steel column pipe sections.
  • Setting the pump and motor at specified depths. The contractor must coordinate with the Contracting Officer's Representative (COR), ensure the site is clean, and adhere to a daily sign-in/out procedure.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Contract Type: Firm-Fixed-Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction
  • Small Business Size Standard: $45 Million
  • Place of Performance: USDA-ARS, Bushland, TX, CPRL South Section
  • Period of Performance: Work to be completed within 30 days of contract award.

Submission & Evaluation

Offers must be emailed to kelly.wright@usda.gov with the subject line "RFQ 1232SA26Q0541". Required submission documents include:

  • A Transmittal Summary Letter.
  • A fully completed and signed SF 1442.
  • A Technical Approach narrative.
  • Two to three documented experience references.
  • A completed and signed SF 24 Bid Bond (minimum 20% of proposed price, not exceeding $3,000,000).
  • Joint Venture Documentation, if applicable. Proposals will be evaluated using the Lowest Priced Technically Acceptable (LPTA) method.

Key Dates

  • Questions Due: May 20, 2026, 10:00 AM Central Time
  • Mandatory Site Visit Deadline: May 20, 2026 (must be scheduled individually with Paul Colaizzi)
  • Quotation Submission Deadline: May 27, 2026, 10:00 AM Central Time
  • Offer Acceptance Period: 60 calendar days from the offer due date.

Important Notes

A mandatory site visit is required; offerors not attending will be deemed non-responsive. Bidders must be registered in the System for Award Management (SAM) at the time of solicitation closing. Wage determinations (TX20260002 Heavy and TX20260265 Building) are applicable, and bidders must ensure compliance with prevailing wage rates and fringe benefits for labor cost estimation.

People

Points of Contact

Kelly WrightPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
Repair of Irrigation Well 2 with Liner and Pump | GovScope