Repair of NSN: 5985-01-307-6290 for the UMTE Program
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Item Description: UMTE Antenna
NSN: 5985-01-307-6290
Part Number: 8811-4900-1
Quantity: 2
Please review the Performance Work Statement (PWS) and FA825026Q0224 document for details.
***RESTRICTED TO PREQUALIFIED SOURCES***
Qualification Requirements: See FAR Part 52.209-1 The requirements of FAR 9.202(a) apply. Sources must be qualified prior to being considered for award. Interested vendors that have not been previously approved for this acquisition must submit a Source Approval Request (SAR) package to the Source Development Small Business Office or the Contracting Officer. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification in the attached Repair Qualification Requirements (Section C document). If requesting access to the technical data package (TDP), please email the contract specialist and contracting officer with a current copy of your DD2345 and JCP printout.
***For those interested in qualifying, please review the Repair Qualification Requirements (RQR)***
NOTE: It is the responsibility of the offeror to ensure their proposal has been successfully emailed to the Primary Contact of this contract opportunity. After sending an email with your proposal please send another email with no attachments to verify the Primary Contact received your proposal. Please review all documents thoroughly. If there are any questions please don't hesitate to email the Primary Contact.