Repair Pier at USCG MSD St Thomas, USVI

SOL #: PNUM32006425Sources SoughtSole Source

Overview

Buyer

Homeland Security
Us Coast Guard
CEU MIAMI(00082)
MIAMI, FL, 33177, United States

Place of Performance

St Thomas, N/A, Virgin Islands, British

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

8(a) Sole Source (FAR 19.8) (8AN)

Timeline

1
Posted
Mar 16, 2026
2
Response Deadline
Apr 1, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) CEU Miami is conducting market research to identify eligible 8(a) firms capable of providing Pier Repair at USCG MSD St Thomas, USVI. This Sources Sought Notice aims to determine the feasibility of an 8(a) sole source acquisition for significant pier and facility improvements. Responses are due April 1, 2026.

Scope of Work

The required work includes furnishing all labor, tools, equipment, and materials for station improvements at the United States Coast Guard Marine Safety Detachment (MSD), St. Thomas, Virgin Islands. Key tasks involve:

  • Repairing pier and damaged wood bridge, including replacing supports, installing water utilities, installing dock fenders, and replacing rusted cleats.
  • Repairing damaged outer pier, including spalled concrete pile caps, installing aluminum anodes, and filling cracks.
  • Replacing existing damaged wood bridge with a structural plastic lumber bridge, including stringers, decking, and steel stringer brackets.
  • Repairing damage to the approach pier, including installing stone and re-grouting.
  • Replacing electrical shore tie at the pier.
  • Repairing the bulkhead, including installing stone and concrete shore protection.
  • Bid, Payment, and Performance Bonds are REQUIRED.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Set-Aside: 8(a) Sole Source (FAR 19.8)
  • Response Due: April 1, 2026, 12:00 PM EST
  • Published: March 16, 2026

Submission Requirements

Interested 8(a) firms must submit:

  • Company name, address, and point of contact
  • 8(a) certification documentation
  • UEI number and CAGE code
  • Relevant experience and capabilities
  • Past performance information (if available)
  • Any additional information demonstrating capability

Additional Notes

This notice is for informational and planning purposes only and does not constitute a solicitation or a commitment by the Government. Responses will not be considered offers and cannot result in contract awards.

People

Points of Contact

Karina GudielPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: Mar 16, 2026
Repair Pier at USCG MSD St Thomas, USVI | GovScope