Repair Roof AS4085

SOL #: N4008526R9004Combined Synopsis/Solicitation

Overview

Buyer

NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Jan 28, 2026
3
Submission Deadline
Jan 15, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for the Repair Roof AS4085 project at Camp Lejeune, NC. This opportunity is a Total Small Business Set-Aside with an estimated value between $1,000,000 and $5,000,000. Proposals are due by January 15, 2026, at 2:00 PM.

Scope of Work

This project involves comprehensive roof repairs for building AS4085. The building will remain occupied throughout the construction period. The scope includes detailed specifications for materials, installation, quality assurance, and environmental protection, covering aspects such as demolition, structural steel, carpentry, metal panels, flashing, insulation, sealants, excavation, landscape establishment, and GIS data deliverables.

Key clarifications from amendments include:

  • Soffit light fixtures are to be removed and reinstalled as required to facilitate new soffit material installation.
  • Gutter and downspout sizes specified in Drawing A-500 (6"x7" gutter, 5"x6" downspout) must be used, overriding any conflicting details from the Garland Basis of Design.
  • Pricing for "CLIN 001 Required: For possible repairs of any damaged roof deck uncovered during demolition" must be provided on the pricing sheet.

Appendix D, a Building Information Checklist, provides extensive details on facility characteristics, systems, and utilities, crucial for understanding existing infrastructure.

Contract & Timeline

  • Contract Type: Solicitation (implied fixed-price based on "Lowest Price" award criterion)
  • Estimated Value: $1,000,000 - $5,000,000
  • Period of Performance: 450 days after award
  • Liquidated Damages: $800 per Calendar Day
  • Proposal Due Date: January 15, 2026, 2:00 PM
  • RFI Cut-off: January 2, 2026, 2:00 PM EST
  • Site Visit: A site visit was scheduled for Tuesday, January 6, 2026, at 8:30 AM at AS4085.
  • Proposal Acceptance Period: 60 days from receipt of offers.

Key Amendments & Clarifications

  • Amendment 0001: Scheduled the site visit for January 6, 2026.
  • Amendment 0002: Addressed RFIs, clarified soffit light fixture handling, and specified gutter/downspout sizes. Included the Site Visit Sign-in Sheet.
  • Amendment 0003: Clarified pricing requirements for CLIN 001 and provided updated drawings (AD101, A-101, A-301).
  • Amendment 0004: Updated the Davis Bacon Act Wage Determination.
  • All amendments confirmed that the time and date for receipt of proposals remain unchanged.

Submission & Evaluation

Award will be based on the Lowest Price. Proposals must be submitted via email to jessica.r.huebner.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil. Offerors are reminded that failure to acknowledge all amendments with their proposal may result in rejection. Bond requirements vary based on proposal value, and the Buy American Requirement-Construction Materials applies.

Contact Information

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 6
Award Notice
Posted: Jan 28, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jan 13, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jan 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 7, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Dec 30, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Dec 16, 2025
View