Repair Transformers Upgrade Lighting Okuma

SOL #: FA527025R0010Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States

Place of Performance

Place of performance not available

NAICS

Capacitor (334416)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

No set aside specified

Timeline

1
Posted
May 1, 2025
2
Last Updated
May 30, 2025
3
Submission Deadline
Jun 5, 2025, 10:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Work will include, but not limited to, removal and replacement of the existing TH-6 and TH-7 electrical system and area lighting at Okuma. Demolish the old transformer house buildings #6 and #7. Replace the existing pole mounted transformers inside of TH-6 and TH-7 with US type outdoor transformer units. New transformers will be concrete pad mounted with footings, mountings, and decorative wall enclosure. Wiring will be rerouted as required to connect power to new transformers. Demolition and dispose of existing transformers, exteriorenclosures, concrete and wooden poles, and lighting include all conduits, conductors, and controls. New transformers will be equipped with new secondary main distribution panels that will include lighting control panels in transformer enclosure. The new outdoor transformer units will sit on new concrete pads with additional handholes. All existing transformers are contaminated with Polychlorinated Biphenyls (PCBs) therefore abatement and disposal of toxic materials must comply with all Government of Japan and Federal rules and regulations. Provide all work and appurtenances for a complete and usable facility. Laydown areas to be determined. This project will comply with applicable DoD, Air Force and base design standards. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Project design is 0% complete as of 20 Jul 2023

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 5
Solicitation
Posted: May 30, 2025
View
Version 4
Solicitation
Posted: May 29, 2025
View
Version 3Viewing
Solicitation
Posted: May 29, 2025
Version 2
Solicitation
Posted: May 27, 2025
View
Version 1
Solicitation
Posted: May 1, 2025
View