REPAIRING OFFICE SPACES, USCG STATION BOSTON

SOL #: 70Z02426Q0000062Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE BOSTON(00024)
BOSTON, MA, 02109, United States

Place of Performance

Boston, MA

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 21, 2026
2
Submission Deadline
Jun 4, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Coast Guard (USCG), specifically BASE BOSTON, is seeking a contractor to perform office space repairs at USCG Station Boston, Boston, MA. This opportunity involves installing an office door, removing caller windows, and painting office spaces. This is a Combined Synopsis/Solicitation and is not a Small Business Set-Aside. Quotes are due by June 4, 2026.

Scope of Work

The contractor shall provide all necessary work, equipment, materials, and disposal for the following:

  • Install one commercial-grade office door (36"x84"x1.75", 90-minute fire rating, UL-listed hardware).
  • Remove two existing "caller" windows, patch and paint the affected wall areas.
  • Paint three offices (approximately 1,000 sqft) with one coat of primer and two coats of off-white, low-VOC eggshell finish paint.

All work must adhere to the attached Statement of Work (SOW) and applicable wage determinations.

Key Requirements & Specifications

  • Door: Solid core, steel, or approved fire-rated material; fire-rated hinges, handle/lockset, automatic closer, panic hardware. Finish to match adjacent doors.
  • Wall Patching: Use materials matching existing construction, ensuring flush and seamless finish.
  • Painting: Surface preparation, minor imperfection patching, sanding, uniform color and finish. Protection of property and thorough cleanup required.
  • Compliance: All materials and installation must comply with NFPA, IBC, and local fire safety regulations.
  • Debris Disposal: All construction debris and removed materials must be taken off-site by the contractor.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Product Service Code (PSC): Z2AA (Repair Or Alteration Of Office Buildings)
  • NAICS Code: 238320
  • Magnitude of Construction: Less than $25,000 (estimated contract value $19K).
  • Place of Performance: 427 Commercial St., Boston MA, 02109.
  • Work Hours: Monday-Friday, 7:30 am - 5:00 pm.
  • Project Start: Within 30 days after award (anticipated Winter 2026).
  • Delivery Date: July 11, 2026.
  • Quotes Due: June 4, 2026, 5:00 PM ET.
  • Published Date: May 21, 2026.

Submission Requirements

Quotes must include:

  • A completed SF18 form (including price and UEI).
  • A detailed breakdown of the quote.
  • Quotes should be emailed to Beverly.A.Primm@uscg.mil.

Special Conditions

  • Wage Determination: Subject to Davis-Bacon Act; prevailing wage rates and fringe benefits for construction trades in Massachusetts (Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, and Suffolk counties) apply. Certified weekly payrolls are required.
  • Safety: Compliance with federal, state, local, and OSHA standards; appropriate PPE; site-specific safety plan; SDS for hazardous materials.
  • Protection of Property: Protect adjacent areas from damage; restore any damaged areas at contractor's expense.
  • Warranty: Minimum one-year warranty on materials and workmanship.
  • Insurance: An insurance certificate is required.
  • Communication: Coordinate all activities with the Contracting Officer Representative (COR).

Points of Contact

People

Points of Contact

Beverly A PrimmPRIMARY
Christopher SleeperSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 21, 2026