Replace and Repair Lock Control System - Smithland Lock and Dam
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Replace and Repair Lock Control System - Smithland Lock and DamThe work includes replacement of the existing control stands for lock operation, replacement o fall existing lock instrumentation equipment, additional of marshalling cabinets for control wiring updates, replacement of portions of the existing control cabling, and updates to the lock operations interlock system to bring system into compliance with current Inland Marine Transportation System Interlock Standard, along withincidental related work.
Amendment 0001 - revised due date 4/21/2025
Amendment 0002 - Site visit information, Offeror's questions and comments.
Amendment 0003 - Site visit information, Solicitation closing date revised to 4/30/2025, wage determinations.
***** Amendment 0004 - contains bid opening info for call in on Wednesday 4/30/2025. ******
Site Visit Attendance sheet uploaded under attachments. 4/28/2025
If there are any issues with submitting bids through PIEE, please contact Joel Huberman by phone or email at 502-315-7409 or Joel.Huberman@usace.army.mil