Replace Chillers 1, 2 & 3

SOL #: 15BBNF26B00000005Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Miami, FL

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 4, 2025
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Jan 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (FBOP) has issued Solicitation 15BBNF26B00000005 for a Firm Fixed-Price construction contract to Replace Chillers 1, 2, & 3 at the Federal Detention Center (FDC) in Miami, Florida. This is a Total Small Business Set-Aside with an estimated value between $1,000,000 and $5,000,000. The current bid due date is January 29, 2026, at 1:00 p.m. CST, though an Amendment 0002 is anticipated to extend this deadline and incorporate Q&A. The notice was last updated on January 22, 2026.

Scope of Work

The contractor will provide all necessary labor, materials, and equipment for the replacement of Chillers 1, 2, & 3. The project scope is detailed in the Statement of Work and Drawings provided with the solicitation. The period of performance is 270 calendar days after contract award.

Contract Details

  • Contract Type: Firm Fixed-Price Construction
  • Estimated Value: $1,000,000 - $5,000,000
  • Set-Aside: Total Small Business Set-Aside (NAICS 238220, $19.0 million size standard)
  • Place of Performance: FDC Miami, 33 NE Fourth Street, Miami, FL 33132
  • Period of Performance: 270 calendar days after award

Submission & Evaluation

Bids must be submitted electronically via the JEFS APP BOX. Required documents include the SF-1442, Commodity or Services Schedule, and an SF-24 Bid Bond for bids over $150,000 (20% of bid price, not to exceed $3,000,000). Past Performance Information and Banking Questionnaires are also required. Award will be made to the responsible, apparent low bidder. Offers must allow for at least 90 calendar days for Government acceptance.

Key Requirements & Notes

  • SAM.gov Registration: Mandatory for all bidders, with business size metrics updated to reflect small business status for NAICS 238220.
  • Bonds: Performance and Payment Bonds (SF-25, 25A) are required within 10 days of award for contracts over $150,000 (each at 100% of the contract price).
  • Labor Standards: Compliance with prevailing wage rates (Davis-Bacon Act, General Decision FL20250215) and Executive Orders for minimum wage and paid sick leave is mandatory.
  • Security: Criminal History Checks are required for all contractor employees working on-site at the BOP facility. A 30-day period for security clearances is included in the performance period.
  • Insurance: Required coverage includes Workers Compensation & Employer's Liability ($100,000), Comprehensive General Liability ($500,000 per occurrence), and Comprehensive Automobile Liability ($200,000 per person, $500,000 per occurrence bodily injury, $20,000 per occurrence property damage).
  • Prime Contractors Only: The FBOP awards only prime contracts; subcontracts are the responsibility of the prime.

Deadlines

  • Current Bid Due Date: January 29, 2026, at 1:00 p.m. CST.
  • Anticipated Amendment: Amendment 0002 is expected to extend the bid due date.
  • Contact: Jeffrey Kercheval (jkercheval1@bop.gov)

People

Points of Contact

Jeffrey KerchevalPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Feb 11, 2026
View
Version 5
Solicitation
Posted: Jan 26, 2026
View
Version 4Viewing
Solicitation
Posted: Jan 22, 2026
Version 3
Solicitation
Posted: Jan 13, 2026
View
Version 2
Solicitation
Posted: Dec 19, 2025
View
Version 1
Pre-Solicitation
Posted: Dec 4, 2025
View
Replace Chillers 1, 2 & 3 | GovScope