Replace DFAC Walk-in Refrigerators & Freezer
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Contractor shall furnish all plant, labor, travel, material, tools and supervision to replace four (4) walk-in refrigerators and one (1) freezer at Aragon Dining Facility, Peterson AFB, CO, in accordance with the solicitation and the revised Statement of Work dated 5 September 2019.
Amendment 1 adds the following verbiage to the SOW:
NOTE: THE EXISTING COMMERCIAL GRADE REFRIGERATION SYSTEM THAT POWERS/SUPPORTS WALK-IN REFRIGERATOR BOXES AND WALK-IN FREEZER BOX WILL NOT BE REPLACED. HOWEVER, IN THE PROCESS OF REPLACING THE WALK-IN REFRIGERATOR BOXES AND THE WALK-IN FREEZER BOX, THE CONTRACTOR MAY BE REQUIRED TO UNINSTALL AND THEN REINSTALL THE CURRENT REFRIGERATION SYSTEM.
Amendment 2 changes the following:
1. Corrects the date of associated SOW in RFQ.
2. Incorporates Attachment #2 - DFAC Walk-in Refrigerators & Freezer Q&A
Amendment 3 changes verbiage in the SOW.
1. The word "INSTALL" is changed to "CONNECT". Thus, the verbiage will hereby read: HOWEVER, IN THE PROCESS OF REPLACING THE WALK-IN REFRIGERATOR BOXES AND THE WALK-IN FREEZER BOX, THE CONTRACTOR MAY BE REQUIRED TO DISCONNECT AND THEN RECONNECT THE CURRENT REFRIGERATION SYSTEM.
2. Corrects the date of associated SOW in RFQ.
Amendment 4 changes the following:
1. Response date is changed from Wednesday, 11 September 2019, 4:00 P.M. MST to Monday, 16 September 2019, 4:00 P.M. MST.
Amendment 5 changes the following:
1. Revised SOW dated 13 September 2019 is incorporated into RFQ.
2. Adds Cooler/Evaporator unit with solenoid information for each walk-in box.
3. Changes response date to Tuesday, 17 September 2019, 4:00 P.M. MST.