Replace Fuel Tanks at building 2096
SOL #: W912D026Q0098Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
0413 AQ HQ CONTRACT
FORT WAINWRIGHT, AK, 99703-0510, United States
Place of Performance
Fort Wainwright, AK
NAICS
Commercial and Institutional Building Construction (23622)
PSC
Repair Or Alteration Of Office Buildings (Z2AA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 13, 2026
2
Last Updated
Apr 14, 2026
3
Submission Deadline
May 16, 2026, 9:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is soliciting proposals for the replacement of fuel tanks at Building 2096 at Fort Wainwright, Alaska. This is a 100% Small Business Set-Aside combined synopsis/solicitation for commercial items. The project involves the demolition of existing tanks and installation of new 500-gallon diesel and MOGAS tanks, along with associated site improvements and electrical work. Offers are due by June 1, 2026, at 1:00 PM AST.
Scope of Work
The project entails the comprehensive replacement of fuel tanks at Building 2096. Key tasks include:
- Demolition: Removal of existing 300-gallon Diesel and 300-gallon Gasoline Fuel Tanks, and associated clearing/grubbing.
- Excavation: Preparation for a new concrete pad and underground electrical systems, with specific procedures for handling potentially contaminated material.
- Installation: Construction of an 8' x 12'-6" concrete pad, and installation of new 500-gallon Diesel and 500-gallon MOGAS above-ground double-wall fuel tanks.
- Electrical & Site Improvements: Installation of power conduits, pole area lighting, emergency fuel shut-off buttons, new pole-mounted lights, a personnel gate, signage, and bollards.
- Restoration: Topsoil and seeding of disturbed areas.
- Protection: Measures to protect existing communication lines and utilities during excavation.
Contract Details
- Type: Combined Synopsis/Solicitation for commercial items, resulting in a Fixed Price Contract.
- Set-Aside: 100% Small Business Set-Aside (FAR 19.5).
- NAICS: 236220 (Commercial and Institutional Building Construction) with a size standard of $41,000,000.00.
- Place of Performance: Fort Wainwright, Alaska 99703.
- Period of Performance: Work shall commence no later than 10 days after receipt of Notice to Proceed (NTP) and be 100% complete no later than 220 days following NTP.
- Funding: Funds are not presently available for this acquisition; award is contingent upon appropriated funds being made available.
Submission & Evaluation
- Offer Submission: Offers must be submitted via email only to abdullah.o.mustapha.civ@army.mil or Jefferey.a.morgan.civ@army.mil. Late offers will not be considered.
- Required Content: Offers must include complete and detailed technical specifications, estimated delivery date, SAM Unique ID Number, CAGE Code, and Tax Identification number. Offerors must complete the Price Proposal Schedule (Attachment 3) and Enclosure 1 - Cost Estimate Breakdown Summary Sheet.
- Evaluation Criteria: Proposals will be evaluated based on total price and adherence to solicitation requirements. Price analysis will consider the Grand Project Total (Attachment 3) and may involve comparison to RTOP, IGCE, historical data, market surveys, and the RS Means Estimating Guide. Non-compliance may lead to elimination.
Key Dates & Site Visit
- Site Visit: A site visit will be conducted on April 27, 2026, at 08:30 AM AST at Fort Wainwright, Building 2096. Interested parties must contact the Fort Wainwright Contracting Office by April 23, 2026, for attendance instructions.
- Questions Due: All questions concerning this solicitation are due by May 11, 2026, at 5:00 PM AST. A Q&A will be posted approximately two business days after questions are received.
- Offers Due: June 1, 2026, at 1:00 PM AST.
Special Requirements & Compliance
Contractors must adhere to extensive requirements, including:
- Registration: Must be registered in the System for Award Management (SAM) at the time of submission.
- Environmental: Compliance with Fort Wainwright's environmental requirements for construction, demolition, and renovation projects, including an Erosion and Sediment Control Plan, Simplified Field Screening Plan for excavated soil, and Solid Waste Reporting Requirements (SWARWeb). Procedures for handling contaminated and hazardous materials are detailed.
- Safety: Compliance with NFPA, OSHA, Federal standards, EM 385-1-1, and submission of a Site Safety and Health Plan (SSHP).
- Quality Control: Implementation of a 3-phase quality control process.
- Documentation: Extensive submittal requirements outlined in Attachment 4, including project schedules, accident prevention plan, quality control plan, environmental protection plan, as-built drawings, and operation and maintenance manuals.
- BUILDER System: Specific data capture requirements for installed and removed equipment using the BUILDER system, including physical tagging and photography.
People
Points of Contact
Abdullah O. MustaphaPRIMARY
Jefferey MorganSECONDARY
Files
Versions
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 13, 2026