Z--Replace HVAC at the Southern Plains Indians Museum

SOL #: 140D0426Q0292Solicitation

Overview

Buyer

Interior
Departmental Offices
IBC ACQ SVCS DIRECTORATE (00004)
HERNDON, VA, 20170, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Maintenance Of Museums And Exhibition Buildings (Z1JA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 7, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
May 1, 2026, 7:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, through the IBC ACQ SVCS DIRECTORATE, is soliciting proposals for the removal and replacement of the HVAC system at the Southern Plains Indian Museum in the Rosemary Ellison (RE) Gallery, Anadarko, Oklahoma. This is a Total Small Business Set-Aside. Proposals are due May 1, 2026, at 2:30 PM Central.

Scope of Work

The project requires replacing the existing, inoperable HVAC system in the RE Gallery with a new unit that includes a dehumidification control system. Key tasks include:

  • Installation of a new HVAC unit and appropriate pad.
  • Examination and repair of existing interior ductwork for air leaks.
  • Assessment and repair of building airflow.
  • Verification of existing heating/cooling systems and building layout.
  • Provision of at least an industry-standard warranty on parts and labor.
  • Disposal of all debris to a certified landfill.
  • Performance of Test and Balance (TAB) to ensure optimal system operation, with a certified HVAC TAB report required.
  • The installed unit must maintain humidity between 40-60% year-round and comply with all applicable state and local codes (OSHA, ASHRAE, EPA).

Contract & Timeline

  • Contract Type: Firm-fixed price purchase order.
  • Period of Performance: June 5, 2026, to August 4, 2026. Performance is expected to begin within 5 calendar days of award and complete within 60 calendar days of notice to proceed.
  • Offer Acceptance Period: Minimum of 60 calendar days.
  • Published Date: April 16, 2026.

Submission & Evaluation

  • Submission Deadline: Friday, May 1, 2026, at 2:30 PM Central.
  • Submission Method: Email to Joan Clarkston (joan_clarkston@ibc.doi.gov). Subject line must include the RFQ number.
  • Evaluation Factors: Award will be made to the responsible quoter whose offer is most advantageous, considering Technical (meeting/exceeding requirements, warranty, new equipment preference), Most advantageous and realistic completion schedule, Past Performance, and Price.
  • Submission Format: Quotes must be submitted in two volumes: Volume I (General and Technical Quote) and Volume II (Price Quote).
  • Past Dates: A site showing was held on April 14, 2026, and questions were due by April 16, 2026.

Eligibility & Special Requirements

  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors, with a size standard of $19 Million.
  • SAM Registration: Offerors must be registered in the System for Award Management (SAM).
  • Prevailing Wages: Bidders must adhere to the prevailing wage rates specified in Wage Determination OK20260070 for Caddo and surrounding Oklahoma counties.
  • Hazardous Materials: Asbestos and Lead-Based Paint (LBP) are present. Abatement of these materials must be performed by trained and accredited contractors licensed by the State of Oklahoma and certified by the EPA/DEQ, following specific safety regulations. Air monitoring and clearance samples are required for all disturbing activities. Verbal notification to the COR and Regional Safety Manager is required 24 hours prior to any ACM/Lead/LBP disturbing activities.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Apr 24, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 16, 2026
Version 1
Solicitation
Posted: Apr 7, 2026
View