REPLACE LIFT STATION PUMPS AT MILFORD

SOL #: 140P4526R0015Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
NER SERVICES MABO (43000)
BOSTON, MA, 02108, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Sewage And Waste Facilities (Z2ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Submission Deadline
Apr 27, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), through its NER SERVICES MABO (43000) office, has issued a Combined Synopsis/Solicitation (RFP) for the replacement of wastewater lift station pumps at the Delaware Water Gap National Recreation Area in Milford Beach, PA. This is a Total Small Business Set-Aside with an estimated project magnitude between $25,000 and $100,000. Proposals are due by April 27, 2026, at 12:00 PM EST.

Scope of Work

This firm-fixed-price contract requires construction services to restore reliable wastewater conveyance operations. Key tasks include:

  • Pump Removal and Replacement: Remove and dispose of two existing submersible wastewater pumps, then furnish and install two new 10-horsepower, 460-volt, three-phase submersible sewage pumps. These must be suitable for raw wastewater, designed for wet well guide rail installation, and compatible with the existing lift-out guide rail system.
  • Lift Station Rehabilitation: Remove and replace existing pump guide rails, guide brackets, hardware, and associated piping with new stainless steel or corrosion-resistant components.
  • Discharge Line Replacement: Remove and replace discharge piping from the wet well to the existing check valve assembly with new piping, fittings, and flanges rated for wastewater pressure service.
  • Testing and Startup: Confirm correct pump rotation, system operation, proper seating on guide rails, and absence of leaks.
  • Special Requirements: Obtain all required permits, comply with OSHA confined space regulations, and provide a minimum twelve (12) month manufacturer's warranty. A site-specific safety plan is required prior to mobilization.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
  • Size Standard: $19 Million.
  • Estimated Value: $25,000 - $100,000.
  • Period of Performance: Work to be completed within 60 calendar days after receiving Notice to Proceed. The contractor shall begin performance within 10 calendar days of NTP.
  • Place of Performance: Milford Beach, Delaware Water Gap National Recreation Area.

Submission & Evaluation

  • Proposals Due: April 27, 2026, by 12:00 PM EST.
  • Submission Method: Via email to mary_hallmon@ios.doi.gov. Proposals must be submitted in two volumes: Volume 1 (Technical and Past Performance) and Volume 2 (Price).
  • Questions Due: All questions must be submitted in writing by April 15, 2026.
  • Site Visit: A site visit is scheduled; contact Damion Green via email for details.
  • Evaluation Criteria: Award will be made to the offeror providing the best value based on price, technical approach (Pass/Fail), past performance, and prior experience. Proposals must be valid for a minimum of 60 days.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM) and have current online Representations and Certifications.

Additional Notes

  • Bonds: Performance and payment bonds are required within 10 calendar days after award.
  • Wage Rates: Prevailing wage rates (General Decision Number PA20260103 for Pike County, PA) apply and must be adhered to for labor cost estimation and compliance.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
REPLACE LIFT STATION PUMPS AT MILFORD | GovScope