Replace Triangle Pool Liner - Keesler Air Force Base

SOL #: MAHG251039Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3010 81 CONS CC
KEESLER AFB, MS, 39534-2701, United States

Place of Performance

Biloxi, MS

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 24, 2026
2
Response Deadline
Apr 2, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically Keesler Air Force Base, MS, is conducting a Sources Sought for market research purposes to identify qualified small businesses capable of replacing the pool liner, filter media, above-ground pipes, and water heaters at Building 7506. This is not a solicitation for offers, but responses will inform a future Firm Fixed-Price contract, anticipated to be a Total Small Business Set-Aside. The estimated construction magnitude is between $250,000 and $500,000. Responses are due by April 2, 2026.

Scope of Work

The project involves comprehensive pool renovation, including:

  • Demolition: Removal and disposal of the existing pool liner, filter media, approximately 120 linear feet of above-ground piping, and two pool heaters.
  • Preparation: Cleaning and resurfacing of the gunite pool, including preparation for a new liner and testing existing paint compatibility.
  • New Construction: Installation of a new white marcite plaster pool liner (approx. 164ft x 54ft), priming and painting of interior and apron markings, installation of approximately 120 linear feet of new above-ground piping, new pool filter medium for both tanks, and two new pool heaters (Copper-Fin² model No: CPN2072 or approved equal), each rated at a minimum of 2,070,000 BTU with a GPM of 115.

Period & Place of Performance

  • Location: Triangle Pool, 7506 Galaxy Street, Biloxi MS, 39534.
  • Performance Time: Work to begin 10 days after award and conclude 180 days later.

Special Requirements

Contractors must adhere to OSHA standards, applicable Federal, State, Local, and Air Force environmental regulations. This includes procedures for hazardous materials, storm water management (SWPPP if ground disturbance exceeds 5,000 sq ft), asbestos abatement, and lead-based paint management. Safety precautions, including a competent safety officer, are mandatory. Submittals such as a Material Submittal Schedule (MSS) are required. Contractor personnel will need base access passes. Work hours are generally 7:00 AM to 5:00 PM, with coordination for off-hours. Deliverables include warranties, O&M manuals, reports, and as-built drawings.

Response Requirements

Each response, limited to a maximum of 3 pages, must include:

  • Company name, address, Point of Contact, phone number, email address.
  • Company's small business category (e.g., WOSB, SDB, 8(a), HUBZone, SDVOSB).
  • A brief statement of interest and detailed capability to complete a project of this type.

Contract & Timeline

  • Type: Sources Sought (Market Research)
  • Set-Aside: Total Small Business Set-Aside (anticipated for future solicitation)
  • Construction Magnitude: $250,000 - $500,000
  • Response Due: April 2, 2026, by 1:00 PM CST
  • Published: March 24, 2026
  • Contact: Chance Daisy (chance.daisy@us.af.mil)

Additional Notes

This notice is for market research only; it is not a solicitation. Responses are voluntary and will not be reimbursed. The attachments provided are drafts.

People

Points of Contact