Replace Underground Water Valves
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through W7NR USPFO ACTIVITY NYANG 109, has issued Solicitation W50S8J26QA013 for the Replacement of Underground Water Valves at Stratton Air National Guard Base, Scotia, NY 12302. This is a Total Small Business Set-Aside. A mandatory site visit was held on May 05, 2026, and quotes are due by May 14, 2026, at 12:00 PM local time.
Scope of Work
This project involves replacing underground water valves and associated piping, comprising a base bid and three optional tasks:
- Base Bid: Replace a 12" water valve that cannot fully shut down. This requires excavation (approximately 6 feet deep), protective systems, and scheduled utility shutdowns on designated 'down days' (every other Friday), with continuous work until service is restored by the following Monday. The contractor will remove the old valve, install a new 12" gate valve, and perform proper excavation, bedding, backfilling, compaction, and paving.
- Option 1: Replace a 6" valve located in asphalt.
- Option 2: Replace three (3) 6" valves located in grass.
- Option 3: Replace a leaking elbow on an 8" line, approximately 100 feet from the base scope valve, involving excavation, pipe replacement, installation of a new ductile iron elbow, pipe footing, and concrete thrust blocking. The project must commence within 14 days of the Notice to Proceed (NTP) and be completed within 60 days. Contractors are responsible for all materials, labor, supervision, site cleanliness, debris removal, and compliance with installation security and training requirements (AT Level I, OPSEC). A "WATER" utility map is provided to aid understanding of the existing infrastructure.
Contract Details
- Contract Type: Firm Fixed Price (FFP) for all line items.
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction), with a small business size standard of $45M.
- Set-Aside: 100% Total Small Business Set-Aside.
- Period of Performance: 14 calendar days to begin performance after award notice, with a total completion time of 60 calendar days.
- Bonds: Performance and Payment Bonds are not required.
Submission & Evaluation
- Quotes Due: May 14, 2026, at 12:00 PM local time.
- Submission Method: Via email to 109.AW.FAL.MSC.CONTRACTING@US.AF.MIL.
- Evaluation Criteria: Quotes will be evaluated based on Price, Technical Experience, and Past Performance. Offerors must provide a brief (max one page) description of a single completed project demonstrating relevant experience for the Technical factor and a verifiable Point of Contact (POC) for Past Performance.
- The Government reserves the right to make an award based on initial submissions without further exchanges.
Site Visit
A mandatory site visit was held on May 05, 2026, at 10:00 AM at the Civil Engineering Building (Bldg. 25), 1 Air National Guard Road, Scotia, NY 12302. Interested parties were required to email 109.aw.fal.msc.contracting@us.af.mil to confirm their intent to attend. A sign-in sheet from this visit is available.
Contact Information
- Primary Contact: Nicholas Bastiani (nicholas.bastiani.2@us.af.mil, 518-344-2513)
- Secondary Contact: Joshua King (109.AW.FAL.MSC.Contracting@us.af.mil, 518-344-2511)