REPLACEMENT OF HEAT COIL

SOL #: 15B30722PR000138Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FCI JESUP
JESUP, GA, 31599, United States

Place of Performance

Jesup, GA

NAICS

Heating Equipment (except Warm Air Furnaces) Manufacturing (333414)

PSC

Space And Water Heating Equipment (4520)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 29, 2022
2
Last Updated
Dec 9, 2022
3
Submission Deadline
Dec 15, 2023, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The Federal Correctional Institution, Jesup Georgia  is looking to replace a quantity of (1) heat coil package. The brand name being requested is Hubbell Model STXVSS-8S-CNE or technically equal to existing equipment, and must match the exisiting equipment that is currently on site. Brand Name or Equal Hubbell Model STXVSS-8S-CNE.

Pricing offered should include freight to ship the HEATER COIL to the destination of the Federal Correctional Institution, Jesup Georgia.

Vendor will be required to have a  Data Universal Numbering System Identifier (DUNS) number and also be registered in the System for Award Management (SAMS) system.  The instructions are attached.  

All payments by the Government to the contractor will be made in accordance with: 52.232-33, Payment by Electronic Funds Transfer-System for Award Management.

People

Points of Contact

C. VINCENTPRIMARY

Files

Files

Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Dec 9, 2022
View
Version 5
Combined Synopsis/Solicitation
Posted: Dec 9, 2022
View
Version 4
Combined Synopsis/Solicitation
Posted: Nov 29, 2022
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Nov 29, 2022
Version 2
Combined Synopsis/Solicitation
Posted: Nov 29, 2022
View
Version 1
Combined Synopsis/Solicitation
Posted: Nov 29, 2022
View
REPLACEMENT OF HEAT COIL | GovScope