Replacement Transformer and Shore Tie at CGC WYACONDA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG) Base New Orleans is soliciting quotes for a Firm-Fixed Price Construction Contract to install a replacement three-phase buck/boost transformer and shore tie for the USCGC WYACONDA in Dubuque, Iowa. This opportunity is a Total Small Business Set-Aside. Quotes are due February 16, 2026, by 1:00 PM CST.
Purpose and Scope
The objective is to obtain a qualified electrical contractor to furnish all labor, materials, equipment, supervision, testing, and documentation necessary to install a three-phase buck/boost transformer system. This system will provide the correct voltage and configuration (230-240 VAC phase-to-phase and 120 VAC phase-to-ground) to safely and reliably supply shore power to the CGC WYACONDA. The work includes replacing the existing city-owned transformer configuration with a 208Y/120 VAC Wye configuration and installing electrical connections in accordance with the National Electrical Code (NEC) and other relevant standards (IEEE 45, MIL-STD-1399, IEEE C57, OSHA). Contractors must perform continuity, insulation resistance, and voltage testing, and verify/document final output voltages.
Contract Details
- Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ 70Z02926QNEWO000006)
- Contract Type: Firm-Fixed Price Construction Contract
- Set-Aside: Total Small Business (100%)
- NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
- PSC Code: Z1NZ (Maintenance Of Other Utilities)
- Place of Performance: USCGC WYCONDA, Dubuque, Iowa 52001
- Performance Period: 60 Days After Receipt of Order (ARO)
- Wage Rates: Subject to the Davis-Bacon Act, specifically General Decision Number IA20260065 for building construction in Dubuque County, Iowa.
Evaluation and Submission
Award will be based on the Lowest Price Technically Acceptable (LPTA) methodology, considering Price, Technical Acceptability, and Past Performance. Contractors must be actively registered in SAM.gov.
- Quotes Due: February 16, 2026, by 1:00 PM CST
- Submission Email: Daniel.Galarza@uscg.mil
- Questions & Site Visit Coordination: All questions and requests for site visit coordination should be directed to CWO Kerry Bunyan at Kerry.R.Bunyan@uscg.mil or (571) 613-1083. Offerors are urged to inspect the site to understand all conditions affecting contract performance.