Request for Information
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
question: Can you please confirm the format in which you would like RFI responses submitted? The FBO posting states that submissions should be Microsoft PowerPoint presentations, but the attachment states that the response is limited to 12 pages + a cover page. Can you please confirm that the Government is requesting a PowerPoint presentation that is 12 slides maximum in length (excluding a cover page), either submitted in its original PPt format or as a PDF?
answer: The format for the response has changed from a 12-page Microsoft PowerPoint presentation to a 12-page Microsoft Office word document, with an optional summary 12-slide PowerPoint presentation.
Question: In regards to the RFI "Virtual/Augmented Reality Technologies" (N00178-19-Q-3001), can I please get a clarification as to the format requested for the response? The FBO site lists a Microsoft PowerPoint presentation and report with requested cost, schedule and technical details. Should the submittal be a PowerPoint presentation and a 12-page Word document; or is the desired format a 12-page annotated PowerPoint presentation with all requested items such as cost included in the presentation?
Answer: The format for the response has changed from a 12-page Microsoft PowerPoint presentation to a 12-page Microsoft Office word document, with an optional summary 12-slide PowerPoint presentation.
Question: Additionally, will there be opportunities for follow-on discussions with the program PM(s) prior to the RFP?
Answer: At this time, there will not be opportunities for follow-on discussions with the program PM(s) prior to the RFP.