Request for Information | F-15 Avionics Systems Supportability Analysis
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force (AFSC/PZAAB) has issued a Request for Information (RFI) for F-15 Avionics Systems Supportability Analysis. This RFI indicates an intent to award a sole-source, Cost-Plus Fixed Fee (CPFF) IDIQ contract to BAE Systems Technology Solutions & Services Inc. for engineering capabilities and knowledge to support F-15 avionics systems. The anticipated period of performance is three years, starting September 2026. Responses to this RFI are due June 26, 2026.
Scope of Work
The requirement involves providing supportability analysis services for F-15 avionics systems. This includes performing desktop Technical Order parts audits and analysis, component verification, data analysis, parts research, reporting, information gathering, data input, tracking, organizing, developing, coordinating, and reviewing all data for the Supply Chain Management and Obsolescence Management Programs. The F-15 fleet's remaining life cycle is scheduled until 2045.
Contract & Timeline
- Type: Anticipated Cost-Plus Fixed Fee (CPFF) IDIQ
- Duration: 12-month Basic Ordering Period + two 12-month Option Ordering Periods (total 3 years)
- Set-Aside: Sole-source to BAE Systems Technology Solutions & Services Inc. (CAGE Code: 99789)
- RFI Response Due: June 26, 2026, at 7:00 PM ET
- Published: June 11, 2026
- Anticipated RFP Posting: June 29, 2026
- Anticipated PoP Start: September 2026
- Place of Performance: Rockville, MD
Evaluation
The Government intends to utilize Other Than Full and Open procedures (RFO 6.104-1(a)(3)), citing BAE Systems as the only source with the necessary knowledge and processes to meet the requirement without unacceptable delays and waste of taxpayer dollars.
Additional Notes
This pre-solicitation notice is issued by AFSC/PZAAB (FA8538). The contract action supports the Air Force Sustainment Center (AFSC), 638th Supply Chain Management Group (SCMG), 409th Supply Chain Management Squadron (SCMS).