Request for Information - Next Generation Penetrator Tail Kit Development

SOL #: EBDA_NGPTK_RFISources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8681 AFLCMC EBD
EGLIN AFB, FL, 32542-6883, United States

Place of Performance

Place of performance not available

NAICS

Search (334511)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Mar 16, 2026
3
Response Deadline
Mar 25, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (AFLCMC/EBD) is conducting market research through a Request for Information (RFI) for the Next Generation Penetrator Tail Kit Development. This RFI seeks industry capabilities to mature a Government-supplied technical data package, develop operational flight program software, and produce tail kit systems for testing and integration. Responses are due March 25, 2026.

Scope of Work

This RFI seeks white papers detailing industry capabilities for:

  • TK Design Maturation: Maturing a Government-supplied technical data package (TDP) for a Weapon Open System Architecture (WOSA) designed tail kit (TK) to the preliminary design review (PDR) level.
  • OFP Software Development: Developing operational flight program (OFP) software for the provided tail kit.
  • Testing: Planning and conducting Software-in-the-Loop (SIL) and Hardware-in-the-Loop (HIL) testing, including analysis of impact accuracy and functionality.
  • Hardware Production: Producing 3 to 5 functioning full-scale TK systems.
  • Flight Testing/Integration: Building tail kits for developmental test series (18-21 flights), providing support and data analysis, and supporting aircraft integration for flight certification.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • Set-Aside: None specified; Government may consider a small business set-aside based on responses.
  • Questions Due: March 9, 2026, 1200 CDT
  • Response Due: March 25, 2026, 1400 CDT
  • Published: March 16, 2026

Evaluation

This RFI is for market research and planning purposes only and does not constitute a solicitation. Responses will be used to characterize technological, manufacturing, and business capabilities to inform a trade space analysis for potential technology demonstration needs. The Government encourages all responsible businesses, including small businesses, to respond.

Additional Notes

Respondents must be registered in the System for Award Management (SAM) database. A controlled document with additional system attribute details was available upon request via DD Form 2345 until March 18, 2026. Responses are voluntary, and no payment will be made for costs incurred.

People

Points of Contact

Mandi JohnsonPRIMARY
Christy CrossSECONDARY

Files

Files

Download
Download

Versions

Version 2Viewing
Sources Sought
Posted: Mar 16, 2026
Version 1
Sources Sought
Posted: Feb 23, 2026
View
Request for Information - Next Generation Penetrator Tail Kit Development | GovScope