Request for Information: Removal and Disposal of High-Flux Isotope Reactor Pressure Vessel at Oak Ridge National Laboratory

SOL #: HFIRRPVFY26Sources Sought

Overview

Buyer

Energy
Energy, Department Of
ORNL UT-BATTELLE LLC-DOE CONTRACTOR
Oak Ridge, TN, 37831, United States

Place of Performance

Oak Ridge, TN

NAICS

Remediation Services (562910)

PSC

Hazardous Substance Removal, Cleanup, And Disposal Services And Operational Support (F108)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 27, 2026
2
Response Deadline
Apr 16, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Energy's Oak Ridge National Laboratory (ORNL), managed by UT-Battelle, LLC, has issued a Request for Information (RFI) for the Removal and Disposal of the High-Flux Isotope Reactor (HFIR) Pressure Vessel at its Oak Ridge, TN facility. This RFI seeks industry input on capabilities for a critical project scheduled for the late 2030s, with an overall timeline spanning 2028-2040. Responses are due April 16, 2026.

Scope of Work

ORNL is seeking turnkey or specialized expertise and resources for the HFIR Reactor Pressure Vessel (RPV) removal, packaging, and disposal of associated radioactive and mixed wastes. Key areas of interest include:

  • Characterization of the RPV source term at final shutdown.
  • Physical vessel removal, storage, transportation, and disposal.
  • Planning, design, testing, and licensing for radioactive/mixed waste packaging and transportation.
  • Clean up and restoration of the reactor and facilities.
  • Disposal of all project radioactive/mixed waste. The RPV is carbon steel with stainless steel cladding; the beryllium reflector is not part of this RFI. ORNL divers will handle activities like disconnecting piping and welding, and ORNL will drain the reactor pool.

Contract & Timeline

  • Type: Request for Information (RFI) / Sources Sought. This is for market research and planning, not a Request for Quote (RFQ).
  • Purpose: Responses will inform future RFQs within the next 3-5 years for engineering studies and the broader RPV replacement project (2028-2040).
  • Set-Aside: None specified; US Businesses are preferred. Foreign ownership, control, or influence concerns must be addressed.
  • RFI Response Due: April 16, 2026, 5:00 PM ET. This date is firm and cannot be extended.
  • Questions Due: March 13, 2026.
  • Published: March 27, 2026.

Submission & Evaluation

Interested parties should submit a written Letter of Interest (LOI) detailing:

  • Organization information, capabilities, staff availability, and assets.
  • Existing NQA-1 certification or a plan to obtain it.
  • Experience in nuclear/radioactive material disposal and reactor decommissioning.
  • Proposed solutions and insights on waste characterization, RPV segmentation, removal, handling, lifting, shielding, closures, packaging, disposal, and decay storage.
  • Discussion of applicable regulatory requirements.
  • A budgetary pricing estimate (Rough Order of Magnitude - ROM). Responses will help ORNL minimize shutdown time, personnel dose, risks, and costs, aiming to get HFIR back online as soon as possible. Site visits are not possible before the RFI due date but can be arranged afterward.

Contact Information

People

Points of Contact

Bill MitchumPRIMARY
Markus CamfieldSECONDARY

Files

Files

Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: Mar 27, 2026
Request for Information: Removal and Disposal of High-Flux Isotope Reactor Pressure Vessel at Oak Ridge National Laboratory | GovScope