Request for Information (RFI) 475215, Helium-Water Shell-and-Tube Heat Exchangers

SOL #: 475215Sources Sought

Overview

Buyer

Energy
Energy, Department Of
BROOKHAVEN NATL LAB -DOE CONTRACTOR
Upton, NY, 11973, United States

Place of Performance

Upton, NY

NAICS

Power Boiler and Heat Exchanger Manufacturing (332410)

PSC

Heat Exchangers And Steam Condensers (4420)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 13, 2026
2
Last Updated
Feb 23, 2026
3
Response Deadline
Feb 27, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Energy (DOE), through Brookhaven Science Associates, LLC (BSA), operator of Brookhaven National Laboratory (BNL), has issued a Request for Information (RFI) 475215 for Helium-Water Shell-and-Tube Heat Exchangers. This RFI is for information and planning purposes only, to survey available resources and understand industry capabilities for a future procurement related to the RHIC Central Helium Plant Helium-Water Heat Exchanger Replacement Project, which will support the future Electron-Ion Collider (EIC).

Responses are due by February 27, 2026.

Purpose

This RFI aims to identify qualified vendors, gather budgetary cost and fabrication schedule estimates, and help potential vendors understand BNL's procurement requirements and timelines. It is not a Request for Proposal (RFP), and no solicitation exists at this time. The information gathered will inform potential future solicitations.

Scope of Information Requested

Interested companies are requested to provide:

  • An indication of interest in bidding on the services.
  • A brief Statement of Capabilities detailing how the company meets the outlined requirements.
  • Answers to specific questions detailed in the RFI document, including:
    • Experience and capabilities in manufacturing, assembling, and testing shell and tube heat exchangers for helium gas water cooling, meeting ASME BPVC Section VIII and specific leak rate specifications (10-9 Torr-L/s).
    • US manufacturing capabilities and compliance with FAR 25.101(a) for domestic end products.
    • Rough Order of Magnitude (ROM) pricing and general fabrication/delivery schedules.
    • Confirmation if the proposed product is a commercial product per FAR 2.101.
    • SAM.gov registration status and Unique Entity Identification (UEI) Number.

Technical Requirements / Scope of Work

The future procurement will involve nine (9) new helium-water shell-and-tube heat exchangers to replace existing units at the Relativistic Heavy Ion Collider (RHIC) central helium refrigeration plant in Upton, NY. Key requirements include:

  • Quantity: Nine (9) heat exchangers (four primary intercoolers, four primary aftercoolers, one smaller utility compressor aftercooler).
  • Design: Shell-and-tube type, two-pass shell with longitudinal baffle (TEMA Type F), designed to minimize helium leakage (cross-stream leak rate must be zero, mass-spec leak checking to 10-9 Torr-L/s).
  • Compliance: Engineered and fabricated to ASME BPVC Section VIII (U-stamped), ASME B31.3, ASTM A269, ASTM A312, TEMA Standards, AWS D1.1/D1.6, and ASME B30.26.
  • Integration: New units must fit into existing locations and mate with existing plumbing (helium on tube-side, water on shell-side).
  • Deliverables: Fabrication, delivery, preliminary and final design reviews, design documentation, engineering calculations, fabrication drawings, material certifications, test procedures, and compliance testing.
  • Operational Parameters: Specific inlet pressures, temperatures, and flow rates for intercoolers (4.5 bar, 405 K to 305 K), primary aftercoolers (16.7 bar, 405 K to 305 K), and utility aftercooler (17 bar, 350 K to 308 K).

Submission Details

  • Deadline: Submittals must be received by BSA no later than 5:00 PM Eastern Time on February 27, 2026.
  • Method: Electronic submissions via email to mnichols@bnl.gov.
  • Subject Line: Emails must include "BSA RFI-475215" in the subject line.

Contact Information

Important Notes

This is solely for information and planning purposes. The U.S. Government will not pay for information solicited. Any information received after the deadline may not be considered. All questions must be submitted via email to the address provided.

People

Points of Contact

Maile NicholsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Sources Sought
Posted: Feb 23, 2026
Version 1
Sources Sought
Posted: Feb 13, 2026
View
Request for Information (RFI) 475215, Helium-Water Shell-and-Tube Heat Exchangers | GovScope