Request for Offerors (RFO) for Delivery of firm load following electric supply service at the William J. Hughes Technical Center (WJHTC) Atlantic City International Airport, NJ

SOL #: 697DCK-26-R-00210Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
692L79 DOT FAA TECHNICAL CENTER
ATLANTIC CITY, NJ, 08405, United States

Place of Performance

Atlantic City, NJ

NAICS

Electric Power Distribution (221122)

PSC

Electric Services (S112)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is seeking offers for firm load following electric supply services for the William J. Hughes Technical Center (WJHTC) at the Atlantic City International Airport, NJ. This unrestricted solicitation covers electric energy, ancillary services, and various charges, including compliance with NJ Renewable Portfolio Standards. The contract is a Firm Fixed-Price for a 12-month period. Offers are due April 29, 2026, at 1:00 PM ET.

Scope of Work

The selected contractor will deliver comprehensive electric supply services to the WJHTC. This includes:

  • Electric energy and ancillary services
  • ARR credits, PJM marginal losses, and NJ Renewable Portfolio Standards compliance
  • Transmission Enhancement Charges, FERC Order 494/745 charges, balancing congestion charges, and RMR charges
  • Capacity and transmission services

Two pricing options are available: Real-Time Residual Metered Load Aggregate (RMLA) LMP or Day-Ahead RMLA LMP, both with a fixed price adder for various services. Line losses will be based on the Offeror's Derated Line Loss Value, while RMR and Capacity charges will be passed through without markup.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Period of Performance: June 1, 2026, to May 31, 2027 (12 months)
  • Delivery Point: AECO Zone
  • Set-Aside: Unrestricted (Full and Open Competition)
  • NAICS Code: 221122 (Electric Power Distribution)
  • Small Business Size Standard: 1100 employees

Submission & Evaluation

  • Offer Submission Deadline: Wednesday, April 29, 2026, 1:00 PM Eastern Time
  • Questions Deadline: April 20, 2026, 2:00 PM Eastern Time, via email to Tito.Stokes@faa.gov
  • Evaluation Criteria: Award will be made to the lowest-priced, technically acceptable Offeror. Technical acceptability requires an active Electric Power Supplier License from the New Jersey Board of Public Utilities.
  • Required Attachments:
    • Attachment 1 (Pricing Sheet): Outlines pricing terms, adders, rates, and charge calculations.
    • Attachment 2 (Price Proposal Form): Provides projected hourly metered data (kWh), Real-Time and Day-Ahead LMP rates, and Capacity/Transmission Peak Load Contributions for modeling.
    • Attachment 3 (Sample Attestation): Template for demonstrating compliance with NJ Renewable Portfolio Standards by attesting to EAC purchase and retirement.
    • Customer Usage Information Authorization: Bidders must obtain this signed form to request historical energy usage data from Atlantic City Electric Company.

Key Contacts

People

Points of Contact

Carolyn MyersSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Apr 15, 2026
Version 1
Solicitation
Posted: Apr 13, 2026
View