Request for Proposal: ALCF HPSS Disk Cache

SOL #: 6-B143-P-00143-00Solicitation

Overview

Buyer

Energy
Energy, Department Of
ARGONNE NATL LAB - DOE CONTRACTOR
Lemont, IL, 60439, United States

Place of Performance

Place of performance not available

NAICS

Computer Storage Device Manufacturing (334112)

PSC

Hardware, Software, And Other Equipment Needed For Specialized High Performance Computing (Hpc) Systems Used In Solving Complex Computational Problems Through Massive Concurrent Use Of Computing Resources And Parallel Processing Techniques. (7K20)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 30, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
Jun 5, 2026, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

UChicago Argonne, LLC, operator of Argonne National Laboratory (ANL), has issued a Request for Proposal (RFP) for an ALCF HPSS Disk Cache. This opportunity seeks a firm fixed-price proposal for hardware, software/licensing, installation, and maintenance/support services for a high-performance block storage system to serve as a disk cache for the ALCF Archive Storage. The primary goal is to efficiently move large amounts of data from high-speed compute clusters to the archive, replacing end-of-life systems. Proposals are due by June 5, 2026.

Scope of Work

The requirement is for a standalone block storage system accessible by Linux data mover hosts, presenting raw, unformatted LUNs. Key specifications include:

  • Capacity: Minimum 10 PiB usable capacity.
  • Performance: Target aggregate throughput of 140 GB/s (SSD) or 90 GB/s (HDD), supporting at least 16 parallel data streams at 90% line rate on a 400GbE link.
  • Connectivity: Support for 100GbE, 200GbE, 400GbE via standard transports.
  • Reliability: High availability, tolerance to electrical/mechanical events, automated rebuilds, and hot-swapping of components.
  • Maintenance & Support: Mandatory 5-year hardware and software maintenance (9x5 NBD), with an optional 12x7 support upgrade, including on-site parts cache and escalation procedures.

Contract Details

  • Contract Type: Firm Fixed-Price.
  • Product Service Code: 7K20 (Hardware, Software, and Other Equipment for Specialized High Performance Computing Systems).
  • Set-Aside: None specified.
  • Place of Performance: Argonne National Laboratory, Theory and Computing Sciences Building (TCS-DC) data center.

Submission & Evaluation

Proposals must be submitted in three parts: Technical, Business Management, and Cost/Price. The award will be made on a Best Value/Trade-Off basis.

  • Evaluation Factors: Technical Proposal (most important), Contractor Responsibility (pass/fail), and Price Proposal. Technical evaluation areas include Overall Technical Requirements, Maintenance and Support, and Installation Services.
  • Required Forms: Bidders must complete the Pricing Proposal Form (Enclosure No. 3) with a detailed Bill of Materials, and the ANL-70B Pre-Award Information Reps & Certs (Enclosure No. 5).
  • Submission: Via email to atkinson@anl.gov.

Compliance & Site Requirements

Bidders must adhere to stringent requirements for on-site work at Argonne National Laboratory, particularly Building 240. These include:

  • Safety & ES&H: Compliance with DOE directives, OSHA, NFPA, ANSI, and specific site rules (e.g., PPE, incident reporting).
  • Insurance: Mandatory minimum coverage including Commercial General Liability ($2M aggregate), Umbrella Liability ($10M), Workers' Compensation (statutory), and Automobile Liability ($1M CSL). Specific additional insureds are required.
  • Facility: Installation in TCS-DC data center, requiring tolerance for raised floor loads and 480Vac power.
  • Terms & Conditions: Adherence to Argonne's standard terms (ANL-71COM), covering cybersecurity, employee conduct, and FAR/DEAR clauses. UChicago Argonne LLC is exempt from Illinois Sales Tax.

Key Dates

  • Proposal Due Date: June 5, 2026, by 4:30 PM CST.
  • Published Date: May 19, 2026.
  • Original Clarification Deadline: May 13, 2026 (now passed).

People

Points of Contact

Court AtkinsonPRIMARY
Sandy SmithSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: May 19, 2026
Version 1
Solicitation
Posted: Apr 30, 2026
View
Request for Proposal: ALCF HPSS Disk Cache | GovScope